Kerala Electricity Supply Code (Removal of Difficulties) (Second Order), 2025

OrderDated 9 Apr 2025Published in the Gazette 10 Apr 2025No. 1234/Con.Engg/2023/KSERC dated 9th April, 2025

Made under the Kerala Electricity Supply Code, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

KSERC's second removal-of-difficulties order under the Kerala Electricity Supply Code, 2014, issued 9 April 2025 and published in the Kerala Gazette on 10 April 2025 (p1). It exists because the Kerala Electricity Supply (Fifth Amendment) Code, 2024 — gazetted 31 July 2024 — inserted Regulation 8A, whose sub-regulation (4) capped a single motor load for 415 V three-phase consumers at 50 hp (37.5 kW) or 30% of distribution transformer capacity, whichever is less (p1–2). Stakeholders complained this denied LT three-phase connections even where consumers had installed dedicated transformers; the Chief Electrical Inspector, by letter of 2 March 2025, confirmed there are no safety concerns if starting current is held to 1.5 times full load current under Regulation 16(3) (p2).

Pages 1–2 are the recitals setting out that reasoning and the Commission's satisfaction that a difficulty has arisen. Page 3 is the operative order: clause 1 gives the short title and commencement (in force from the date of the order); clause 2 disapplies the 50 hp ceiling for low-voltage consumers subject to two conditions — the motor starting current must meet Regulation 16(3), and motor load must not exceed 30% of the supplying distribution transformer's capacity — and supplies a formula for the minimum distribution transformer capacity required (p3).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Conditions of supply

Read with this

The regulation

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (2)

11 more documents belong here and are not on Voltaic: 11 copies in another language.

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document