Kerala Electricity Supply Code, 2014 — Amendment Code, 2020 — Statement of Reasons

STATEMENT OF OBJECTIONS / REASONS

Statement of reasonsDate not stated

The commission's reasons for the Kerala Electricity Supply Code, 2014 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is KSERC's Statement of Objections/Reasons for the Kerala Electricity Supply (Amendment) Code, 2020. It explains how the Commission moved from the draft Kerala Electricity Supply (Amendment) Code, 2019 — published on the Commission's website on 01.08.2019 for comments — through public hearings at Thiruvananthapuram on 24.10.2019 and Ernakulam on 31.10.2019, written submissions and ESCRP/Ombudsman/KSEB Ltd proposals, to final amendments to the Kerala Electricity Supply Code, 2014 (pp1–2).

The bulk of the document is an item-by-item record of proposed changes, stakeholder views and the Commission's decisions. Items (1)–(3) deal with Regulation 11: LT load/contract-demand limits, legacy consumers who had higher sanctioned loads, the meaning of contracted connected load, and LT supply for industrial parks/estates, including low-voltage surcharge and metering at transformer point (pp2–9). Items (4)–(6) cover Regulations 49 and 50: estimating connected load for colonies, residential/commercial complexes and high-rise buildings; who builds, owns and maintains the internal distribution network; and norms for connected-load estimation (pp10–15).

Items (7)–(9) concern Regulation 72 interest on belated payment of interest on security deposit, Regulation 81 site-inspection timelines, and Regulation 95 recovery of labour and material charges for shifting lines, the last following a High Court judgment (pp15–19). Items (10)–(12) cover Regulation 97: suo motu reclassification, the time limit for reclassification and arrears, and installments for consumers to pay reclassification arrears without interest (pp19–22). Items (13)–(14) cover meter stocking under Regulation 125 and the replacement of 'penalty' terminology in Regulations 130–131 (pp22–23).

Items (15)–(21) deal with inspection and assessment under the Electricity Act, 2003: officer grades authorised under ss.126/135, retention of Regulation 152(3) provisos, installments for licensee-fault short collection without interest, and provisional assessment procedure (pp23–28). Items (22)–(25) cover appeal timelines and refund interest under Regulations 157–158, including substitution of FBIL for MCLR as the benchmark (pp28–32). The document ends by approving the final Kerala Electricity Supply (Amendment) Code, 2020 with the stated reasons (p32).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Supply to buildings and colonies, Conditions of supply

Read with this

The regulation

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (2)

11 more documents belong here and are not on Voltaic: 11 copies in another language.

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document