KSERC · Kerala State Electricity Regulatory Commission
Kerala Electricity Supply Code, 2014 — Amendment Code, 2020 — Statement of Reasons
STATEMENT OF OBJECTIONS / REASONS
Statement of reasonsDate not stated
The commission's reasons for the Kerala Electricity Supply Code, 2014 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is KSERC's Statement of Objections/Reasons for the Kerala Electricity Supply (Amendment) Code, 2020. It explains how the Commission moved from the draft Kerala Electricity Supply (Amendment) Code, 2019 — published on the Commission's website on 01.08.2019 for comments — through public hearings at Thiruvananthapuram on 24.10.2019 and Ernakulam on 31.10.2019, written submissions and ESCRP/Ombudsman/KSEB Ltd proposals, to final amendments to the Kerala Electricity Supply Code, 2014 (pp1–2).
The bulk of the document is an item-by-item record of proposed changes, stakeholder views and the Commission's decisions. Items (1)–(3) deal with Regulation 11: LT load/contract-demand limits, legacy consumers who had higher sanctioned loads, the meaning of contracted connected load, and LT supply for industrial parks/estates, including low-voltage surcharge and metering at transformer point (pp2–9). Items (4)–(6) cover Regulations 49 and 50: estimating connected load for colonies, residential/commercial complexes and high-rise buildings; who builds, owns and maintains the internal distribution network; and norms for connected-load estimation (pp10–15).
Items (7)–(9) concern Regulation 72 interest on belated payment of interest on security deposit, Regulation 81 site-inspection timelines, and Regulation 95 recovery of labour and material charges for shifting lines, the last following a High Court judgment (pp15–19). Items (10)–(12) cover Regulation 97: suo motu reclassification, the time limit for reclassification and arrears, and installments for consumers to pay reclassification arrears without interest (pp19–22). Items (13)–(14) cover meter stocking under Regulation 125 and the replacement of 'penalty' terminology in Regulations 130–131 (pp22–23).
Items (15)–(21) deal with inspection and assessment under the Electricity Act, 2003: officer grades authorised under ss.126/135, retention of Regulation 152(3) provisos, installments for licensee-fault short collection without interest, and provisional assessment procedure (pp23–28). Items (22)–(25) cover appeal timelines and refund interest under Regulations 157–158, including substitution of FBIL for MCLR as the benchmark (pp28–32). The document ends by approving the final Kerala Electricity Supply (Amendment) Code, 2020 with the stated reasons (p32).
Read with this
The regulation
- Dated 31 Jan 2014Kerala Electricity Supply Code, 2014
Amendments and corrections
- Dated 8 May 2015Kerala Electricity Supply Code, 2014 — Amendment, 2015
- Dated 11 Jan 2016Kerala Electricity Supply Code, 2014 — Amendment Code, 2016
- Dated 24 Jan 2017Kerala Electricity Supply (Amendment) Code, 2017
- Dated 22 Jan 2020Kerala Electricity Supply (Amendment) Code, 2020
- Dated 26 Jul 2024Kerala Electricity Supply Code, 2014 — Fifth Amendment, 2024
Procedures and orders made under it
- Dated 23 Sep 2014Kerala Electricity Supply Code (Removal of Difficulties) Orders, 2014 — First to Fourth
- Dated 2 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Fifth Order, 2015
- Dated 2 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Fifth Order, 2015
- Dated 3 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015
- Dated 23 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015
- Dated 23 Jun 2015Kerala Electricity Supply Code — Sixth Removal of Difficulties Order, 2015
- Dated 11 Jul 2016Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015 — validity extension to 30.09.2016
- Dated 26 Oct 2016Kerala Electricity Supply Code (Removal of Difficulties) Order, 2016
- Dated 26 Oct 2016Kerala Electricity Supply Code (Removal of Difficulties) Order, 2016
- Dated 20 Nov 2024Kerala Electricity Supply Code (Removal of Difficulties) Order, 2024
- Dated 20 Nov 2024Kerala Electricity Supply Code (Removal of Difficulties) Order, 2024
- Dated 6 Jan 2025Kerala Electricity Supply Code (Removal of Difficulties) Order, 2025
- Dated 6 Jan 2025Kerala Electricity Supply Code (Removal of Difficulties) Order, 2025
- Dated 9 Apr 2025Kerala Electricity Supply Code (Removal of Difficulties) (Second Order), 2025
- Dated 9 Apr 2025Kerala Electricity Supply Code (Removal of Difficulties) (Second Order), 2025
- Dated 9 Oct 2025Kerala Electricity Supply Code (Removal of Difficulties) (Third Order), 2025
- Dated 9 Oct 2025Kerala Electricity Supply Code (Removal of Difficulties) (Third Order), 2025
Consolidated copies, for reference (1)
- Dated 14 Oct 2025Kerala Electricity Supply Code, 2014 (as amended)
Other copies of these documents (2)
- Dated 22 Jan 2020Kerala Electricity Supply (Amendment) Code, 2020
- Dated 26 Jul 2024Kerala Electricity Supply Code, 2014 — Fifth Amendment Code, 2024
11 more documents belong here and are not on Voltaic: 11 copies in another language.
Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.