KSERC · Kerala State Electricity Regulatory Commission
Kerala Electricity Supply Code, 2014 (as amended)
Kerala Electricity Supply Code, 2014
Consolidated copyDated 14 Oct 2025Published in the Gazette 13 Feb 2014In force from 1 Apr 2014No.215/DD/T&D(Rev.)2014/KSERC dated 31stJanuaruy,2014
A consolidated copy of the Kerala Electricity Supply Code, 2014, published by KSERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.
Summary
Summary written by software, from pages 1 to 28 of 229. Check the regulator's original before you rely on it.
This is the Kerala Electricity Supply Code, 2014, issued by the Kerala State Electricity Regulatory Commission under Section 50 read with Section 181 of the Electricity Act, 2003. It applies to all distribution licensees (including deemed licensees), consumers and users in Kerala, and to persons exempted under Section 13 of the Act (p1). It commenced on 1 April 2014 (p1). The supplied excerpt covers only the opening 28 pages of a much longer document: Chapter I (Preliminary) and the start of Chapter II (System, Safety and Standards of Supply of Electricity).
Chapter I (pp1–14) sets out the short title, extent and commencement, then a long list of defined terms. The definitions are consumer/installation-centric: consumer, applicant, agreement, connected load, contracted connected load, contract demand, installation, point of supply, occupier, premises, service line, meter, check meter, defective/faulty meter, temporary connection, user, CGRF and IGRC, among others (pp1–13). Many definitions were substituted or inserted by the Kerala Electricity Supply (Fifth Amendment) Code, 2024, and the footnotes preserve the earlier text (e.g. pp2–11). Regulation 3 gives interpretation rules: the Code must be read consistently with the Act, rules and regulations, and references to statutes include later consolidations/amendments (pp13–14).
Chapter II (pp14–28) is the systems and safety code. Regulations 4–7 require the distribution licensee to develop, maintain and extend an efficient distribution system, supply at system frequency, maintain specified voltage levels and stay within permitted voltage variations (pp14–16). Regulation 8 is the voltage-level ladder: it links new connections, and revisions of connected load or contract demand, to prescribed supply voltage levels. Regulation 8A adds special conditions and relaxations for exceeding those voltage-wise limits, including a 2025 removal-of-difficulties relaxation for larger single motors on LT (pp17–18). Regulations 9–10 leave low-voltage surcharge and high-voltage rebate to KSERC tariff orders (pp18–19).
Regulation 11 caps new LT three-phase demand-based connections and provides transitional protection for consumers existing under the 2005 Code and 2008 amendment, plus conditions for notified industrial areas and multi-storied buildings (pp19–21). Regulation 12 requires dedicated feeders for power quality impairing units at the consumer's cost, subject to an exemption for soft starters/harmonic filters with Electrical Inspector approval (p21). Regulation 13 allows dedicated feeders on consumer request at cost (p21). Regulations 14–21 cover load balancing, consumer wiring standards and Electrical Inspector approvals, earth leakage protection, AC motor starting/control gear and capacitors, irrigation pump set efficiency, parallel operation of consumer generators with the grid (including charges and grid-code compliance), meter/main switch placement, step-down transformer vector group and earthing, and consumer responsibility for safe custody of licensee equipment (pp21–26). Regulations 22–25 address damage/tampering of meters, harmonics dumping (IEEE STD 519-1992 until Indian Standards), ownership/access to service lines and meters, and load shedding/power restriction with Commission approval and emergency SLDC directions (pp26–28).
Read with this
The regulation
- Dated 31 Jan 2014Kerala Electricity Supply Code, 2014
Amendments and corrections
- Dated 8 May 2015Kerala Electricity Supply Code, 2014 — Amendment, 2015
- Dated 11 Jan 2016Kerala Electricity Supply Code, 2014 — Amendment Code, 2016
- Dated 24 Jan 2017Kerala Electricity Supply (Amendment) Code, 2017
- Dated 22 Jan 2020Kerala Electricity Supply (Amendment) Code, 2020
- Dated 26 Jul 2024Kerala Electricity Supply Code, 2014 — Fifth Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 23 Sep 2014Kerala Electricity Supply Code (Removal of Difficulties) Orders, 2014 — First to Fourth
- Dated 2 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Fifth Order, 2015
- Dated 2 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Fifth Order, 2015
- Dated 3 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015
- Dated 23 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015
- Dated 23 Jun 2015Kerala Electricity Supply Code — Sixth Removal of Difficulties Order, 2015
- Dated 11 Jul 2016Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015 — validity extension to 30.09.2016
- Dated 26 Oct 2016Kerala Electricity Supply Code (Removal of Difficulties) Order, 2016
- Dated 26 Oct 2016Kerala Electricity Supply Code (Removal of Difficulties) Order, 2016
- Dated 20 Nov 2024Kerala Electricity Supply Code (Removal of Difficulties) Order, 2024
- Dated 20 Nov 2024Kerala Electricity Supply Code (Removal of Difficulties) Order, 2024
- Dated 6 Jan 2025Kerala Electricity Supply Code (Removal of Difficulties) Order, 2025
- Dated 6 Jan 2025Kerala Electricity Supply Code (Removal of Difficulties) Order, 2025
- Dated 9 Apr 2025Kerala Electricity Supply Code (Removal of Difficulties) (Second Order), 2025
- Dated 9 Apr 2025Kerala Electricity Supply Code (Removal of Difficulties) (Second Order), 2025
- Dated 9 Oct 2025Kerala Electricity Supply Code (Removal of Difficulties) (Third Order), 2025
- Dated 9 Oct 2025Kerala Electricity Supply Code (Removal of Difficulties) (Third Order), 2025
Other copies of these documents (2)
- Dated 22 Jan 2020Kerala Electricity Supply (Amendment) Code, 2020
- Dated 26 Jul 2024Kerala Electricity Supply Code, 2014 — Fifth Amendment Code, 2024
11 more documents belong here and are not on Voltaic: 11 copies in another language.
Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.