KSERC · Kerala State Electricity Regulatory Commission
Kerala Electricity Supply Code, 2014 — Fifth Amendment, 2024
Kerala Electricity Supply (Fifth Amendment) Code, 2024
AmendmentDated 26 Jul 2024No. 1234/Con.Engg/ 2023/ KSERC dated 26th July, 2024
Amends the Kerala Electricity Supply Code, 2014.
Summary
Summary written by software, from pages 1 to 35 of 43. Check the regulator's original before you rely on it.
The Kerala State Electricity Regulatory Commission issued this notification on 26 July 2024 as the Fifth Amendment to the Kerala Electricity Supply Code, 2014 (p1). It is made under Section 181(1) read with Section 50 of the Electricity Act, 2003, and comes into force from the date of publication in the Kerala Official Gazette; the Gazette date is not printed (p1). The amendment is a distribution-side supply code update covering definitions, load and voltage thresholds, new-connection and power-feasibility procedures, charges recovery, metering and billing, security deposits, disconnection, theft/tampered-meter assessment, and a new annexure on single-point supply (pp1-35).
Pages 1-6 rewrite Regulation 2 definitions, including agreement, applicant, check meter, connected load, contract demand, contracted connected load, CGRF, defective/faulty meter, demand factor, due date, IGRC, Nano household units, power quality impairing units and temporary connection (pp1-6). Pages 6-10 then amend voltage and load rules: a note on phasing out the 22 kV network, a substituted Regulation 8 table, a new Regulation 8A allowing limited exceedance of voltage-wise load limits and special motor/voltage conditions, substituted Regulation 11 LT demand-based connection limits with exceptions, and Regulation 12 dedicated feeders for power-quality impairing units (pp6-10).
Pages 10-14 deal with connection charges and service conditions: earth-leakage protection, smart-meter load segregation, Commission-approved per kVA/kW rates and cost data, annual licensee proposals, dedicated feeder wording, and omission of Regulation 46 (pp10-14). Pages 14-20 insert Regulation 50A power feasibility sanction for loads above 20 kW/kVA and amend single-point supply, lapse of applications, extension of time, deposit interest, refunds, and the online application process under new Regulation 75 (pp14-20). Pages 20-25 substitute Regulations 76, 77 and 79 and amend Regulations 78 and 80-83 and 85, setting application processing, inspection, re-inspection and final-demand-note timelines (pp20-25).
Pages 25-31 insert Regulation 90A on EV charging outlets in multi-storey buildings and domestic premises and amend online filing, meter replacement, billing, RE metering, advance payment and landlord-tenant deposit provisions (pp25-31). Pages 31-35 amend arrears settlement, payment modes, disconnection notices, unauthorised/additional load, tampered-meter procedure and interest references; they also insert Annexure 23 on single-point supply.
The amendment repeatedly aligns the Code with CEA safety and metering regulations and with the Supreme Court judgment dated 16 November 2022 invalidating Regulation 153(15) of the 2014 Code (p33). It leaves many details to future licensee submissions or Commission approvals, including revised agreement formats, online portal formats and penalty methodology (pp20, 29, 33-34).
Read with this
The regulation
- Dated 31 Jan 2014Kerala Electricity Supply Code, 2014
Amendments and corrections
- Dated 8 May 2015Kerala Electricity Supply Code, 2014 — Amendment, 2015
- Dated 11 Jan 2016Kerala Electricity Supply Code, 2014 — Amendment Code, 2016
- Dated 24 Jan 2017Kerala Electricity Supply (Amendment) Code, 2017
- Dated 22 Jan 2020Kerala Electricity Supply (Amendment) Code, 2020
Commencement notices and reasons
Procedures and orders made under it
- Dated 23 Sep 2014Kerala Electricity Supply Code (Removal of Difficulties) Orders, 2014 — First to Fourth
- Dated 2 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Fifth Order, 2015
- Dated 2 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Fifth Order, 2015
- Dated 3 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015
- Dated 23 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015
- Dated 23 Jun 2015Kerala Electricity Supply Code — Sixth Removal of Difficulties Order, 2015
- Dated 11 Jul 2016Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015 — validity extension to 30.09.2016
- Dated 26 Oct 2016Kerala Electricity Supply Code (Removal of Difficulties) Order, 2016
- Dated 26 Oct 2016Kerala Electricity Supply Code (Removal of Difficulties) Order, 2016
- Dated 20 Nov 2024Kerala Electricity Supply Code (Removal of Difficulties) Order, 2024
- Dated 20 Nov 2024Kerala Electricity Supply Code (Removal of Difficulties) Order, 2024
- Dated 6 Jan 2025Kerala Electricity Supply Code (Removal of Difficulties) Order, 2025
- Dated 6 Jan 2025Kerala Electricity Supply Code (Removal of Difficulties) Order, 2025
- Dated 9 Apr 2025Kerala Electricity Supply Code (Removal of Difficulties) (Second Order), 2025
- Dated 9 Apr 2025Kerala Electricity Supply Code (Removal of Difficulties) (Second Order), 2025
- Dated 9 Oct 2025Kerala Electricity Supply Code (Removal of Difficulties) (Third Order), 2025
- Dated 9 Oct 2025Kerala Electricity Supply Code (Removal of Difficulties) (Third Order), 2025
Consolidated copies, for reference (1)
- Dated 14 Oct 2025Kerala Electricity Supply Code, 2014 (as amended)
Other copies of these documents (2)
- Dated 22 Jan 2020Kerala Electricity Supply (Amendment) Code, 2020
- Dated 26 Jul 2024Kerala Electricity Supply Code, 2014 — Fifth Amendment Code, 2024
11 more documents belong here and are not on Voltaic: 11 copies in another language.
Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.