Skip to content

KSERC · Kerala State Electricity Regulatory Commission

Kerala Electricity Supply Code, 2014 — Fifth Amendment, 2024

Kerala Electricity Supply (Fifth Amendment) Code, 2024

AmendmentDated 26 Jul 2024No. 1234/Con.Engg/ 2023/ KSERC dated 26th July, 2024

Amends the Kerala Electricity Supply Code, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software, from pages 1 to 35 of 43. Check the regulator's original before you rely on it.

The Kerala State Electricity Regulatory Commission issued this notification on 26 July 2024 as the Fifth Amendment to the Kerala Electricity Supply Code, 2014 (p1). It is made under Section 181(1) read with Section 50 of the Electricity Act, 2003, and comes into force from the date of publication in the Kerala Official Gazette; the Gazette date is not printed (p1). The amendment is a distribution-side supply code update covering definitions, load and voltage thresholds, new-connection and power-feasibility procedures, charges recovery, metering and billing, security deposits, disconnection, theft/tampered-meter assessment, and a new annexure on single-point supply (pp1-35).

Pages 1-6 rewrite Regulation 2 definitions, including agreement, applicant, check meter, connected load, contract demand, contracted connected load, CGRF, defective/faulty meter, demand factor, due date, IGRC, Nano household units, power quality impairing units and temporary connection (pp1-6). Pages 6-10 then amend voltage and load rules: a note on phasing out the 22 kV network, a substituted Regulation 8 table, a new Regulation 8A allowing limited exceedance of voltage-wise load limits and special motor/voltage conditions, substituted Regulation 11 LT demand-based connection limits with exceptions, and Regulation 12 dedicated feeders for power-quality impairing units (pp6-10).

Pages 10-14 deal with connection charges and service conditions: earth-leakage protection, smart-meter load segregation, Commission-approved per kVA/kW rates and cost data, annual licensee proposals, dedicated feeder wording, and omission of Regulation 46 (pp10-14). Pages 14-20 insert Regulation 50A power feasibility sanction for loads above 20 kW/kVA and amend single-point supply, lapse of applications, extension of time, deposit interest, refunds, and the online application process under new Regulation 75 (pp14-20). Pages 20-25 substitute Regulations 76, 77 and 79 and amend Regulations 78 and 80-83 and 85, setting application processing, inspection, re-inspection and final-demand-note timelines (pp20-25).

Pages 25-31 insert Regulation 90A on EV charging outlets in multi-storey buildings and domestic premises and amend online filing, meter replacement, billing, RE metering, advance payment and landlord-tenant deposit provisions (pp25-31). Pages 31-35 amend arrears settlement, payment modes, disconnection notices, unauthorised/additional load, tampered-meter procedure and interest references; they also insert Annexure 23 on single-point supply.

The amendment repeatedly aligns the Code with CEA safety and metering regulations and with the Supreme Court judgment dated 16 November 2022 invalidating Regulation 153(15) of the 2014 Code (p33). It leaves many details to future licensee submissions or Commission approvals, including revised agreement formats, online portal formats and penalty methodology (pp20, 29, 33-34).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Billing and payment

Read with this

The regulation

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (2)

11 more documents belong here and are not on Voltaic: 11 copies in another language.

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document