Skip to content

KSERC · Kerala State Electricity Regulatory Commission

Kerala Electricity Supply Code (Removal of Difficulties) Fifth Order, 2015

Kerala Elecaicity Supply Code (Removal of Difficulties) Fifth Order, 2015

OrderDated 2 Jun 2015Published in the Gazette 29 Jun 2015215/DD/T&Dr'14/KSERC dated 2nd June, 2015

Made under the Kerala Electricity Supply Code, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page Kerala State Electricity Regulatory Commission order that uses the "removal of difficulties" route to relax one specific proviso in the Kerala Electricity Supply Code, 2014. The recitals (p1–2) set out why: regulation 100(1) of the Code makes an application to reduce connected load or contract demand admissible only after six months from original energization for LT connections and only after one year for HT/EHT connections, and regulation 100(2) allows such a request only once in six months thereafter (p1). Several HT consumers — described as mostly industrial or commercial units — told the Commission that the one-year wait for a first reduction of contract demand forced them to pay heavy demand charges in their early months of operation, when consumption was well below contract demand because of teething troubles in production and marketing (p2). The Commission records that it is satisfied a difficulty has arisen from the implementation of regulation 100(1) for such consumers (p2).

Operatively, the order is in two clauses (p2). Clause 1 gives the short title and says it comes into force on the date of the order. Clause 2 is the substantive change: for HT consumers, an application for the first reduction of contract demand is to be accepted after six months from the date of original energization of the HT connection, i.e. the same waiting period that already applies to LT consumers (p2). The relief is expressly a relaxation of sub-regulation (1) of regulation 100 only, and the order is made in public interest; nothing in it touches the once-in-six-months rule in regulation 100(2), the LT position, or the substantive grounds on which a reduction may be sought (p2). It is issued by the Secretary by order of the Commission and printed in the Kerala Gazette Extraordinary of 29 June 2015 (p1–2).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes

Read with this

The regulation

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (2)

11 more documents belong here and are not on Voltaic: 11 copies in another language.

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document