KSERC · Kerala State Electricity Regulatory Commission

Kerala Electricity Supply Code (Removal of Difficulties) Order, 2024

OrderDated 20 Nov 2024No. 1234/Con.Engg/ 2023/ KSERC dated 20th November, 2024

Made under the Kerala Electricity Supply Code, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short KSERC order dated 20 November 2024 that uses the removal-of-difficulties route under Regulation 179 of the Kerala Electricity Supply Code, 2014 to reconcile the Code with central rules (p1).

The recitals set out the problem. The Commission had amended the Code through the Kerala Electricity Supply (Fifth Amendment) Code, 2024 (Gazette Extraordinary No. 2479, 31 July 2024), which fixed per kVA/kW charge rates for consumers and applicants at LT and 11 kV (excluding those under Regulation 36) and set a timeline under Regulation 85(1)(iii) for connections where no extension or augmentation is needed (p1). KSEB Ltd's letter of 17 October 2024 told the Commission that the Ministry of Power wanted clarity on the 200 metre limit in Regulation 32(2)(i), and had directed DISCOMs to specify metro-city connection timelines in line with the Electricity (Rights of Consumers) Amendment Rules, 2024 (p1–2). The Commission was satisfied that difficulties had arisen from the perceived difference between the central rules and the Code (p2).

The operative part has three paragraphs. Paragraph 1 gives the title and states commencement on the date of the order. Paragraph 2 defines "Electrified areas" as an area with distribution mains at the respective voltage level within 200 metres of the proposed connection — this is the answer to the 200 metre question, framed as a definition for implementing the Code. Paragraph 3 relaxes Regulation 85(1)(iii) notwithstanding anything in it: for new connections in metropolitan areas where extension or augmentation is not required, the licensee must give service connection within three days of a complete application (p2).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Connection and miscellaneous charges, Conditions of supply

Read with this

The regulation

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (2)

11 more documents belong here and are not on Voltaic: 11 copies in another language.

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document