This is a short KSERC order dated 20 November 2024 that uses the removal-of-difficulties route under Regulation 179 of the Kerala Electricity Supply Code, 2014 to reconcile the Code with central rules (p1).
The recitals set out the problem. The Commission had amended the Code through the Kerala Electricity Supply (Fifth Amendment) Code, 2024 (Gazette Extraordinary No. 2479, 31 July 2024), which fixed per kVA/kW charge rates for consumers and applicants at LT and 11 kV (excluding those under Regulation 36) and set a timeline under Regulation 85(1)(iii) for connections where no extension or augmentation is needed (p1). KSEB Ltd's letter of 17 October 2024 told the Commission that the Ministry of Power wanted clarity on the 200 metre limit in Regulation 32(2)(i), and had directed DISCOMs to specify metro-city connection timelines in line with the Electricity (Rights of Consumers) Amendment Rules, 2024 (p1–2). The Commission was satisfied that difficulties had arisen from the perceived difference between the central rules and the Code (p2).
The operative part has three paragraphs. Paragraph 1 gives the title and states commencement on the date of the order. Paragraph 2 defines "Electrified areas" as an area with distribution mains at the respective voltage level within 200 metres of the proposed connection — this is the answer to the 200 metre question, framed as a definition for implementing the Code. Paragraph 3 relaxes Regulation 85(1)(iii) notwithstanding anything in it: for new connections in metropolitan areas where extension or augmentation is not required, the licensee must give service connection within three days of a complete application (p2).
Read with this
The regulation
- Dated 31 Jan 2014Kerala Electricity Supply Code, 2014
Amendments and corrections
- Dated 8 May 2015Kerala Electricity Supply Code, 2014 — Amendment, 2015
- Dated 11 Jan 2016Kerala Electricity Supply Code, 2014 — Amendment Code, 2016
- Dated 24 Jan 2017Kerala Electricity Supply (Amendment) Code, 2017
- Dated 22 Jan 2020Kerala Electricity Supply (Amendment) Code, 2020
- Dated 26 Jul 2024Kerala Electricity Supply Code, 2014 — Fifth Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 23 Sep 2014Kerala Electricity Supply Code (Removal of Difficulties) Orders, 2014 — First to Fourth
- Dated 2 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Fifth Order, 2015
- Dated 2 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Fifth Order, 2015
- Dated 3 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015
- Dated 23 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015
- Dated 23 Jun 2015Kerala Electricity Supply Code — Sixth Removal of Difficulties Order, 2015
- Dated 11 Jul 2016Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015 — validity extension to 30.09.2016
- Dated 26 Oct 2016Kerala Electricity Supply Code (Removal of Difficulties) Order, 2016
- Dated 26 Oct 2016Kerala Electricity Supply Code (Removal of Difficulties) Order, 2016
- Dated 20 Nov 2024Kerala Electricity Supply Code (Removal of Difficulties) Order, 2024
- Dated 6 Jan 2025Kerala Electricity Supply Code (Removal of Difficulties) Order, 2025
- Dated 6 Jan 2025Kerala Electricity Supply Code (Removal of Difficulties) Order, 2025
- Dated 9 Apr 2025Kerala Electricity Supply Code (Removal of Difficulties) (Second Order), 2025
- Dated 9 Apr 2025Kerala Electricity Supply Code (Removal of Difficulties) (Second Order), 2025
- Dated 9 Oct 2025Kerala Electricity Supply Code (Removal of Difficulties) (Third Order), 2025
- Dated 9 Oct 2025Kerala Electricity Supply Code (Removal of Difficulties) (Third Order), 2025
Consolidated copies, for reference (1)
- Dated 14 Oct 2025Kerala Electricity Supply Code, 2014 (as amended)
Other copies of these documents (2)
- Dated 22 Jan 2020Kerala Electricity Supply (Amendment) Code, 2020
- Dated 26 Jul 2024Kerala Electricity Supply Code, 2014 — Fifth Amendment Code, 2024
11 more documents belong here and are not on Voltaic: 11 copies in another language.
Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.