Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015 — validity extension to 30.09.2016

Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order 2015 has been extended up to 30.09.2016

OrderDated 11 Jul 2016Published in the Gazette 9 Jul 2015No. 781/Com.Ex/KSERC/2015 dated 11th July, 2016

Made under the Kerala Electricity Supply Code, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Kerala State Electricity Regulatory Commission issued this one-page notification on 11 July 2016 (p1) to extend, for a further period up to 30.09.2016, the Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015. That order — notified on 23.06.2015 under No. 781/Com.Ex/KSERC/2015 and gazetted on 09.07.2015 — was made under Regulation 179 of the Kerala Electricity Supply Code, 2014 to relieve KSEB Ltd and other licensees of the Supply Code's timelines for constructing the service line, plant, or both, required to be provided to applicants, given procedural and administrative delays in procuring materials and awarding works.

The recitals set out the relief's history: it originally ran only to 31.12.2015, and was extended to 30.06.2016 by the Commission's order dated 29.12.2015 (p1). KSEB Ltd's Chief Engineer (Commercial and Tariff) asked for a further extension to 31.12.2016 so that willing consumers could continue to procure materials and carry out the work to specification under licensee supervision. The Commission granted only up to 30.09.2016, short of what was sought (p1). The notification prints no Gazette date for itself and states no separate commencement.

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Conditions of supply

Read with this

The regulation

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (2)

11 more documents belong here and are not on Voltaic: 11 copies in another language.

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document