This is a KSERC notification amending the Kerala Electricity Supply Code, 2014. The short-title clause names it the Kerala Electricity Supply (Amendment) Code, 2020 and brings it into force on publication in the Official Gazette (p2). The notification is dated 22 January 2020 (p1), while the Kerala Gazette Extraordinary carrying it is dated 19 June 2020 (p1). It is made under s.181(1) and (2) read with s.181(3) of the Electricity Act, 2003 (p1).
A large share of the amendments rework Regulation 11 and Regulations 49–50. The Regulation 11 changes concern supply voltage and connected load: a carve-out is added for consumers billed on contract demand, and two provisos are substituted to grandfather low-tension consumers who held loads above the prescribed limits when the 2005 Code came in or under the 2008 Fourth Amendment, letting them stay at LT on payment of low voltage supply surcharge; a further proviso caps contract demand for industrial consumers in notified industrial parks and estates at 150 kVA at LT, with metering at the transformer point (pp2–3). Regulations 49 and 50 are reworked for colonies, residential, commercial and industrial complexes and high-rise buildings: how total connected load is estimated or certified, who builds, hands over and maintains the internal distribution network and metering cubicle, and the load norm per plinth area constructed (pp3–4).
The remaining clauses are narrower but consumer-facing: interest on delayed adjustment of amounts (p4); the licensee's response window widened from five to seven working days (p4); recovery of line-shifting labour and material charges on Commission-approved cost data (p4); how arrear or excess charges from reclassification are determined and a twelve-month interest-free instalment facility, with the old proviso deleted (pp4–5); renaming of 'late payment penalty' as 'interest on late payment' and removal of 'penal' from the title of Regulation 131 (p5).
The enforcement chain is also amended. Entry and inspection powers are restated, with a proviso reserving proceedings under s.126 of the Act to the assessing officer designated by the Government; inspection is permitted before provisional assessment; the provisional assessment order must state a seven-day payment option for consumers who do not challenge it; Regulation 155(12) is omitted; appeal-related windows are extended from seven to thirty days; and refunds carry interest at 'FBIL +200 base points' compounded half-yearly where the appellate authority finds no unauthorised use or where the consumer deposited more than was due (pp5–7).
Read with this
The regulation
- Dated 31 Jan 2014Kerala Electricity Supply Code, 2014
Amendments and corrections
- Dated 8 May 2015Kerala Electricity Supply Code, 2014 — Amendment, 2015
- Dated 11 Jan 2016Kerala Electricity Supply Code, 2014 — Amendment Code, 2016
- Dated 24 Jan 2017Kerala Electricity Supply (Amendment) Code, 2017
- Dated 26 Jul 2024Kerala Electricity Supply Code, 2014 — Fifth Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 23 Sep 2014Kerala Electricity Supply Code (Removal of Difficulties) Orders, 2014 — First to Fourth
- Dated 2 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Fifth Order, 2015
- Dated 2 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Fifth Order, 2015
- Dated 3 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015
- Dated 23 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015
- Dated 23 Jun 2015Kerala Electricity Supply Code — Sixth Removal of Difficulties Order, 2015
- Dated 11 Jul 2016Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015 — validity extension to 30.09.2016
- Dated 26 Oct 2016Kerala Electricity Supply Code (Removal of Difficulties) Order, 2016
- Dated 26 Oct 2016Kerala Electricity Supply Code (Removal of Difficulties) Order, 2016
- Dated 20 Nov 2024Kerala Electricity Supply Code (Removal of Difficulties) Order, 2024
- Dated 20 Nov 2024Kerala Electricity Supply Code (Removal of Difficulties) Order, 2024
- Dated 6 Jan 2025Kerala Electricity Supply Code (Removal of Difficulties) Order, 2025
- Dated 6 Jan 2025Kerala Electricity Supply Code (Removal of Difficulties) Order, 2025
- Dated 9 Apr 2025Kerala Electricity Supply Code (Removal of Difficulties) (Second Order), 2025
- Dated 9 Apr 2025Kerala Electricity Supply Code (Removal of Difficulties) (Second Order), 2025
- Dated 9 Oct 2025Kerala Electricity Supply Code (Removal of Difficulties) (Third Order), 2025
- Dated 9 Oct 2025Kerala Electricity Supply Code (Removal of Difficulties) (Third Order), 2025
Consolidated copies, for reference (1)
- Dated 14 Oct 2025Kerala Electricity Supply Code, 2014 (as amended)
Other copies of these documents (2)
- Dated 22 Jan 2020Kerala Electricity Supply (Amendment) Code, 2020
- Dated 26 Jul 2024Kerala Electricity Supply Code, 2014 — Fifth Amendment Code, 2024
11 more documents belong here and are not on Voltaic: 11 copies in another language.
Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.