Skip to content

KSERC · Kerala State Electricity Regulatory Commission

Kerala Electricity Supply (Amendment) Code, 2017

THE KERALA ELECTRICITY SUPPLY (AMENDMENT) CODE, 2017

AmendmentDated 24 Jan 2017No. 58/AD(Law)/KSERC/2016/KSERC dated 24th January, 2017

Amends the Kerala Electricity Supply Code, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a KSERC notification amending the Kerala Electricity Supply Code, 2014, issued at Thiruvananthapuram on 24 January 2017 under s.50 read with s.181 of the Electricity Act 2003 (p1). It takes effect from the date of publication in the Official Gazette, but no Gazette date is printed (p1). The changes are few but operationally important for distribution licensees, applicants for new works and existing consumers.

Amendment (i) substitutes the item in regulation 15(4) that classifies multi-storeyed buildings, using a height threshold of "above 15 M" (p1). Amendment (ii) inserts a new regulation 37A letting the licensee permit an applicant to procure materials and execute electric line or plant works himself, notwithstanding regulations 27, 32, 36 and 37 (p1). It imposes conditions: materials to conform to BIS or other specified standards; procurement with the approval of the officer competent to sanction the estimate and warranty as stipulated by the licensee; execution by a duly licensed electrical contractor to CEA safety standards; Electrical Inspector approval under the CEA (Measures Relating to Safety and Electric Supply) Regulations, 2010 before energising; and licensee supervision for an administrative overhead charge capped at "ten percent of the cost of labour and transport" per Commission-approved cost data. A proviso bars the licensee from recovering any other regulation 36/37 expenditure from an applicant who has done the work himself (p1–2).

Amendment (iii) replaces the penal charge in regulation 111(1) with the fee in the Schedule of Miscellaneous Charges for special meter reading under regulation 112 (p2). Amendment (iv) rewrites regulation 139(6) so the consumer must remove the cause of disconnection within "one hundred and eighty days from the date of disconnection" instead of forty-five days, failing which supply is dismantled without further notice (p2). Amendment (v) relabels the Schedule 2 item II supervision charge as Administrative Overhead Charges at the rate of 10% of I(c) and I(d) (p2).

The Explanatory Note (p2) records the Code Review Panel's 26.5.2016 recommendations, the Commission's own suo motu amendments, publication of the draft "Second Amendment Code, 2016" on 26.10.2016 and the public hearing on 30.11.2016.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Connection and miscellaneous charges

Read with this

The regulation

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (2)

11 more documents belong here and are not on Voltaic: 11 copies in another language.

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document