Skip to content

GERC · Gujarat Electricity Regulatory Commission

Consultation Paper — Methodology for Determination of Banking Charges for RE Open Access Consumers under Green Energy Open Access Regulations, 2024

Methodology for Determination of Banking Charges for Renewable Energy Open Access Consumers under provisions of GERC (Green Energy Open Access) Regulations, 2024

Published with a draftDated 20 Jun 2026

Draft

The draft has since been finalised as the Green Energy Open Access Regulations, 2024 — Sixth Amendment, 2026.

Published with the Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This consultation paper by the Gujarat Electricity Regulatory Commission works out how banking charges for renewable energy open access consumers should be determined under the GERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024. It traces the policy chain from the Ministry of Power's 2021 draft and 2022 Green Energy Open Access Rules, through the Forum of Regulators' model work, to GERC's 2024 Regulations and the MoP clarification of 21.08.2024 on the minimum 30% monthly banking threshold (p5–7). It records that Regulation 17.6(viii) set a temporary Rs. 1.50/unit banking charge to 30.09.2024, that First to Fourth Amendments extended it to 30.06.2026, and that a draft Fifth Amendment proposes to carry it to 31.08.2026 while the Commission completes this exercise (p7). The paper is issued to invite stakeholder comments before determining charges under Regulation 17.6(viii) (p8).

Chapter 2 sets out the proposed methodology. It compares cumulative and non-cumulative banking, adopts cumulative banking, fixes the banking period as a calendar month, and uses 15-minute ABT meter data for about 165 renewable energy open access consumers from the four state Discoms (p9–11). It then specifies slot-wise computation of adjusted RE injection, net surplus, net drawl, cumulative banked energy and lapsed energy; sub-scenarios based on peak/off-peak period and on whether IEX market clearing price is above or below the variable cost of the marginal thermal station plus transmission charges; assumed disposition of surplus through IEX sale, BESS charging or backing down; assumed sourcing of deficit through IEX purchase, BESS or ramping up; and formulas for cost, revenue, net banking cost and the banking charge itself (p13–25).

Chapter 3 applies the method to data for April 2025 to January 2026, reports monthly and consolidated banking charges for DGVCL, MGVCL, PGVCL, UGVCL and at state level, and states a state-level result of Rs. 1.06/unit (p26–28). It notes that the sample is limited, concentrated in PGVCL, and lacks a comparable benchmark because most other states recover banking charges in kind (p28). It proposes uniform state-wide charges for 01.09.2026 to 31.03.2027, quarterly data reporting from the January 2026 quarter, and a rolling three-calendar-year basis from FY2030-31 onwards (p29). It closes by proposing a Sixth Amendment to substitute clause 1(4) and Regulation 17.6(viii) (p29).

Standard name
Green Energy Open Access Regulations
Primary topics
Energy banking, Green energy open access

Read with this

The regulation

Procedures and orders made under it

Earlier drafts

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document