Green Energy Open Access Regulations, 2024 — First Amendment — Statement of Reasons

Gujarat Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) (First Amendment) Regulations, 2024.

Statement of reasonsDated 23 Sep 2024

The commission's reasons for the Green Energy Open Access Regulations, 2024 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Gujarat Electricity Regulatory Commission's Statement of Reasons for the First Amendment to its Green Energy Open Access Regulations, 2024, recorded at Gandhinagar on 23/09/2024 (p4). The Principal Regulations — notified as Notification No. 08 of 2024 dated 21.02.2024 — had made the banking charge of Rs. 1.50 per unit effective only up to 30 September 2024, with charges from 1 October 2024 onwards to be fixed separately (p1).

Because the Commission's study to determine a banking-cost framework is still in progress, the amendment substitutes Regulation 1(4) and Regulation 17.6(viii) so the existing charge continues for a further six months, up to 31 March 2025 or an earlier date on which the Commission notifies charges by separate regulation (p2).

Section 2 records the consultation: a draft amendment notification dated 31.08.2024, public notices inviting suggestions and objections, written comments, and a public hearing held on 19.09.2024 (p2–3). Section 3 sets out stakeholder suggestions — banking charges in kind at 8% of banked energy and the lack of stated logic for the Rs. 1.50 rate; a marginal-cost power-purchase proposal to avoid socialising banking cost — and the Commission's reasoning for acknowledging but deferring them pending the ongoing cost study (p3). Suggestions on the base for levying banking charges, clarification of the 30% banked-energy quantum, and peak-hour drawal were held to be outside the scope of the draft and not considered at this stage (p4). The Commission directs publication of the amendment in the Official Gazette (p4). Annexure I lists stakeholders who filed written comments and Annexure II lists those present at the hearing (p5–6).

Standard name
Green Energy Open Access Regulations
Primary topics
Energy banking, Green energy open access

Read with this

The regulation

Procedures and orders made under it

Earlier drafts

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document