Skip to content

GERC · Gujarat Electricity Regulatory Commission

Green Energy Open Access Regulations, 2024 — Second Amendment, 2025

Gujarat Electricity Regulatory Commission (Terms & Conditions for Green Energy Open Access) (Second Amendment) Regulations, 2025.

AmendmentDated 28 Mar 2025Notification No. 06 of 2025 dated 28/03/2025

Amends the Green Energy Open Access Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the second amending instrument to GERC's 2024 Green Energy Open Access Regulations (cited here as "the Principal Regulations", Notification No. 8 of 2024). It is short — two operative clauses on pp1–2 — and does one thing: it rewrites the two provisions that govern the banking charge so as to put an end date on the rate currently in force.

Clause 2 substitutes Clause 1(4) of the principal regulations, restating that the banking charge under Regulation 17.6 takes effect from the date of this notification and runs only up to 30 September 2025, or an earlier date on which the Commission notifies such charges separately (p1). Clause 3 substitutes Regulation 17.6(viii), setting out the same window for the banking charge of Rs. 1.50 per unit and stating that banking charges for the period after that will follow a separate Commission notification (pp1–2).

Clause 1 gives the title, confines the amendment to the whole of Gujarat, and provides that it comes into force on publication in the Official Gazette; the Gazette date is not printed. The instrument is signed by the Secretary at Gandhinagar on 28 March 2025 (p2). Page 3 carries no readable content.

Standard name
Green Energy Open Access Regulations
Primary topics
Energy banking

Read with this

The regulation

Procedures and orders made under it

Earlier drafts

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document