Skip to content

GERC · Gujarat Electricity Regulatory Commission

Green Energy Open Access Regulations, 2024 — Sixth Amendment, 2026 — Statement of Reasons

Gujarat Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) (Sixth Amendment) Regulations, 2026

Statement of reasonsDated 19 Aug 2026

The commission's reasons for the Green Energy Open Access Regulations, 2024 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software, from pages 1 to 35 of 76. Check the regulator's original before you rely on it.

This is the Statement of Reasons (SoR) for the GERC (Terms and Conditions for Green Energy Open Access) (Sixth Amendment) Regulations, 2026. It explains why the Commission is resetting the banking-charge framework for green-energy open access in Gujarat and how it dealt with stakeholder objections. Pages 1–3 set the background: the 2024 Principal Regulations introduced a banking charge, and the Commission has been studying a cost-reflective methodology while successive amendments continued the earlier charge. Pages 3–5 describe consultation: the draft amendment, explanatory memorandum and consultation paper were published on 20.06.2026; newspaper notices invited comments; a public hearing was held on 21.07.2026 and the deadline was extended to 28.07.2026.

The bulk is clause-wise analysis. Section 3.1 (p5–18) covers proposed Regulation 1(4). It retains a fixed transitional banking charge for 01.09.2026–31.03.2027, rejects in-kind/percentage banking, rejects retrospective true-up or refund of earlier charges, and inserts a proviso letting the Commission continue the existing charge by separate order if the annual determination cannot be completed in time. Section 3.2 (p18–34) covers proposed Regulation 17.6(viii): from 01.04.2027 banking charges are to be determined annually from actual preceding-period data supplied by Distribution Licensees, with mandatory affidavits, possible SLDC verification, common charges for licensees with common procurement, a floor and ceiling, and a 'Nil' charge plus pro-rata deemed-revenue adjustment where data is not supplied. Section 3.3 (p34–35) begins stakeholder comments on the proposed Annexure-I methodology. Annexures A and B list stakeholders. The SoR records the Commission's finalisation decisions; the actual amendment notification and Annexure-I text are not included in pages 1–35.

Standard name
Green Energy Open Access Regulations
Primary topics
Energy banking, Green energy open access, ARR and true-up

Read with this

The regulation

Procedures and orders made under it

Earlier drafts

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document