Green Energy Open Access Regulations, 2024 — Sixth Amendment, 2026 — Statement of Reasons
Gujarat Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) (Sixth Amendment) Regulations, 2026
Statement of reasonsDated 19 Aug 2026
The commission's reasons for the Green Energy Open Access Regulations, 2024 or one of its amendments.
Summary
Summary written by software, from pages 1 to 35 of 76. Check the regulator's original before you rely on it.
This is the Statement of Reasons (SoR) for the GERC (Terms and Conditions for Green Energy Open Access) (Sixth Amendment) Regulations, 2026. It explains why the Commission is resetting the banking-charge framework for green-energy open access in Gujarat and how it dealt with stakeholder objections. Pages 1–3 set the background: the 2024 Principal Regulations introduced a banking charge, and the Commission has been studying a cost-reflective methodology while successive amendments continued the earlier charge. Pages 3–5 describe consultation: the draft amendment, explanatory memorandum and consultation paper were published on 20.06.2026; newspaper notices invited comments; a public hearing was held on 21.07.2026 and the deadline was extended to 28.07.2026.
The bulk is clause-wise analysis. Section 3.1 (p5–18) covers proposed Regulation 1(4). It retains a fixed transitional banking charge for 01.09.2026–31.03.2027, rejects in-kind/percentage banking, rejects retrospective true-up or refund of earlier charges, and inserts a proviso letting the Commission continue the existing charge by separate order if the annual determination cannot be completed in time. Section 3.2 (p18–34) covers proposed Regulation 17.6(viii): from 01.04.2027 banking charges are to be determined annually from actual preceding-period data supplied by Distribution Licensees, with mandatory affidavits, possible SLDC verification, common charges for licensees with common procurement, a floor and ceiling, and a 'Nil' charge plus pro-rata deemed-revenue adjustment where data is not supplied. Section 3.3 (p34–35) begins stakeholder comments on the proposed Annexure-I methodology. Annexures A and B list stakeholders. The SoR records the Commission's finalisation decisions; the actual amendment notification and Annexure-I text are not included in pages 1–35.
Read with this
The regulation
- Dated 20 Feb 2024Green Energy Open Access Regulations, 2024
Amendments and corrections
- Dated 23 Sep 2024Green Energy Open Access (First Amendment) Regulations, 2024
- Dated 28 Mar 2025Green Energy Open Access Regulations, 2024 — Second Amendment, 2025
- Dated 24 Sep 2025Green Energy Open Access Regulations, 2024 — Third Amendment, 2025
- Dated 30 Mar 2026Green Energy Open Access Regulations, 2024 — Fourth Amendment, 2026
- Dated 30 Jun 2026Green Energy Open Access Regulations, 2024 — Fifth Amendment, 2026
- Dated 19 Aug 2026Green Energy Open Access Regulations, 2024 — Sixth Amendment, 2026
- Dated 24 Sep 2026Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Errata
Commencement notices and reasons
- Dated 20 Feb 2024Green Energy Open Access Regulations, 2024 — Statement of Reasons
- Dated 23 Sep 2024Green Energy Open Access Regulations, 2024 — First Amendment — Statement of Reasons
- Dated 28 Mar 2025Green Energy Open Access Regulations, 2024 — Second Amendment, 2025 — Statement of Reasons
- Dated 25 Sep 2025Green Energy Open Access Regulations, 2024 — Third Amendment, 2025 — Statement of Reasons
- Dated 30 Mar 2026Green Energy Open Access Regulations, 2024 — Fourth Amendment, 2026 — Statement of Reasons
- Dated 30 Jun 2026Green Energy Open Access Regulations, 2024 — Fifth Amendment, 2026 — Statement of Reasons
Procedures and orders made under it
Earlier drafts
- Dated 23 Jun 2023Green Energy Open Access Regulations, 2023 — Draft
- Dated 31 Aug 2024Green Energy Open Access Regulations, 2024 — First Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Green Energy Open Access (First Amendment) Regulations, 2024 — Explanatory Note — Draft
- Dated 23 Jan 2025Green Energy Open Access Regulations, 2024 — Second Amendment, 2025 — Draft
- Dated 30 Aug 2025Green Energy Open Access Regulations, 2024 — Third Amendment, 2025 — Draft
- Dated 30 Aug 2025Explanatory memorandum: Terms and Conditions for Green Energy Open Access Regulations, 2024 — Third Amendment, 2025 — Explanatory Memorandum — Draft
- Dated 11 Mar 2026Terms & Conditions for Green Energy Open Access (Fourth Amendment) Regulations, 2026 — Draft
- Dated 11 Mar 2026Explanatory memorandum: Green Energy Open Access (Fourth Amendment) Regulations, 2026 — Explanatory Memorandum — Draft
- Dated 6 Jun 2026Green Energy Open Access (Fifth Amendment) Regulations, 2026 — Draft
- Dated 6 Jun 2026Explanatory memorandum: Green Energy Open Access Regulations, 2024 — Fifth Amendment, 2026 — Explanatory Memorandum — Draft
- Dated 20 Jun 2026Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Draft
- Dated 20 Jun 2026File: Consultation Paper — Methodology for Determination of Banking Charges for RE Open Access Consumers under Green Energy Open Access Regulations, 2024
- Dated 20 Jun 2026Explanatory memorandum: Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Explanatory Memorandum — Draft
5 more documents belong here and are not on Voltaic: 5 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.