Skip to content

GERC · Gujarat Electricity Regulatory Commission

Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Draft

Gujarat Electricity Regulatory Commission (Terms & Conditions for Green Energy Open Access) (Sixth Amendment) Regulations, 2026

Draft amendmentDated 20 Jun 2026

Draft

A proposal that has since been finalised as the Green Energy Open Access Regulations, 2024 — Sixth Amendment, 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the draft Sixth Amendment to the Gujarat Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) Regulations, 2024, issued from Gandhinagar on 20 June 2026 for previous publication (p1). It extends to the whole State of Gujarat and is to come into force from the date of publication in the Official Gazette (p1); the Gazette date is not printed.

Regulations 1–3 (pp1–3) carry the operative amendments. Regulation 2 substitutes Regulation 1(4) of the Principal Regulations, fixing the banking charge at a flat Rs. 1.00 per unit from 1 September 2026 to 31 March 2027 and leaving charges from 1 April 2027 to be determined under Regulation 17.6 (p1). Regulation 3 substitutes Regulation 17.6(viii) (pp2–3): charges computed on the Annexure-I methodology stay applicable until 31 March 2027, and from 1 April 2027 are to be re-determined for each financial year on distribution licensees' data for the preceding calendar year. Provisos require licensees to file sworn, complete data (verifiable by SLDC), let the Commission fix common charges for the four state-owned discoms and/or small licensees, for private licensees with common procurement, and for SEZ/SIR/Port and new licensees, cap variation between Rs. 0.50 and Rs. 1.50 per unit where data is complete, and set the charge at 'Nil' where it is not — with deemed revenue adjusted in the ARR so consumers do not bear the cost of non-compliance.

Annexure-I (pp4–14) is the methodology the amendment makes operative. It sets out nomenclature and data sources, then computes banking charges as aggregate net revenue impact on the distribution licensee divided by total banked energy for a one-calendar-month billing cycle, using 15-minute block injection and consumption data, IEX clearing prices, marginal thermal variable cost, transmission charges and losses, backing-down cost, solar tariff and BESS cost. Step 1 computes slot-wise surplus or drawl per consumer under four sub-scenarios keyed to IEX price versus thermal variable cost plus transmission charges, allocating energy to exchange sale, BESS charging or thermal backing down. It also prescribes FIFO cumulative banking, lapsed energy and the carried-over banking restrictions. Steps 2–4 aggregate across consumers, compute cost and revenue per slot, and derive the final per-unit charge.

Standard name
Green Energy Open Access Regulations
Primary topics
Energy banking, Open access charges

Read with this

The regulation

Procedures and orders made under it

Earlier drafts

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document