Skip to content

GERC · Gujarat Electricity Regulatory Commission

Green Energy Open Access Regulations, 2023 — Draft

Gujarat Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) Regulations, 2023

Draft regulationDated 23 Jun 2023NOTIFICATION NO. ______ OF 2023 dated 23/06/2023

Draft

A proposal that has since been finalised as the Green Energy Open Access Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Gujarat Electricity Regulatory Commission's draft framework for Green Energy Open Access. It is dated 23 June 2023 at Gandhinagar and is to extend to the whole State of Gujarat; it will come into force from the date of its notification in the Gujarat Official Gazette, which is not printed (p1, p46). It is made under s.181 of the Electricity Act, 2003 read with ss.39, 40, 42, 61 and 86, and it gives effect in Gujarat to the Ministry of Power's Electricity (Promoting Renewable Energy through Green Energy Open Access) Rules, 2022 (p1, p3). Its stated objective is non-discriminatory open access to the intra-state transmission and/or distribution system for green energy, including methodology for open access charges and banking (pp1–2).

The early regulations set definitions, interpretation, scope and criteria (pp3–8). They define green energy broadly, create the category of Green Energy Open Access Consumer, and set the basic eligibility threshold: a consumer with contracted demand or sanctioned load of 100 kW or more, through a single connection or multiple connections aggregating to 100 kW in the same electricity division; captive consumers have no load limit (pp4, p9, p12). Open access is classified by duration into long-term, medium-term and short-term, with criteria for using inherent margins and spare system capacity (pp7–8).

Applications are to be made through the Central Nodal Agency's portal and routed to the State Nodal Agency; SLDC is the State Nodal Agency for short-term and STU for medium- and long-term green energy open access (p13). The regulations then cover application procedure, eligibility, treatment of existing RE open access, and allotment priority, including priority for distribution licensees, green energy over normal open access, and long-term over medium- and short-term (pp9–15).

The grant procedure is set out in detail with a processing timeline table, fees, bank guarantee, agreement execution and deemed-approval consequences if nodal agencies or GETCO/DISCOMs miss timelines (pp15–24). A separate procedure governs day-ahead green energy open access transactions through the Central Portal (pp24–25). Utilisation and non-utilisation, including relinquishment and transfer, are then addressed (pp25–26).

Energy accounting distinguishes inter-state transactions, governed by CERC regulations, from intra-state transactions, governed by the GERC Forecasting and Scheduling Regulations, 2019 and relevant RE tariff orders (pp26–27). The charges chapter lists transmission charges, wheeling charges, cross-subsidy surcharge, additional surcharge, standby charges, banking charges, scheduling charges, deviation settlement and other fees, with many rates left to future Commission tariff orders (pp27–36). It also sets banking mechanics, the hierarchy for settling energy from multiple RE sources, payment security through LC/BG, and relinquishment compensation (pp32–40).

The remaining regulations cover curtailment priority, dispute resolution and appeal, metering, reactive energy charges, compliance with grid and distribution codes, collection and disbursement of charges, information publication by SLDC, monthly reporting, communication facilities, and the Commission's powers to issue directions, relax, amend and remove difficulties (pp40–44). The inconsistency and saving clauses establish a hierarchy of Act over Rules over Regulations over orders over government policy, repeal the GERC (Open Access) Regulations, 2011 to the extent of green energy open access, and preserve existing open access and prior agreements (pp44–46). Schedule I provides the annual captive status verification regime: affidavits, documents, consumption and equity criteria, assessment methods and consequences of failure (pp47–54).

Standard name
Green Energy Open Access Regulations
Primary topics
Green energy open access, Open access, Open access charges

Read with this

The regulation

Procedures and orders made under it

Earlier drafts

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document