Skip to content

GERC · Gujarat Electricity Regulatory Commission

Green Energy Open Access Regulations, 2024 — Statement of Reasons

Statement of Reasons — GERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024

Statement of reasonsDated 20 Feb 2024

The commission's reasons for the Green Energy Open Access Regulations, 2024 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software, from pages 1 to 40 of 332. Check the regulator's original before you rely on it.

The document is the Statement of Reasons (SoR) issued by the Gujarat Electricity Regulatory Commission for the Gujarat Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) Regulations, 2024. Pages 1–2 set out the background: the Regulations are made under section 181 of the Electricity Act, 2003 read with sections 39, 40, 42, 61 and 86; they follow the Ministry of Power's Electricity (Promoting Renewable Energy through Green Energy Open Access) Rules, 2022 and amendments, the Central Nodal Agency/POSOCO procedure and the Forum of Regulators' model methodology for open access and banking charges. The Commission also records national renewable-energy and green-hydrogen targets (p1–2).

Page 3 describes consultation: the draft GERC Green Energy Open Access Regulations, 2023 was published on 23.06.2023, comments were invited up to 26.07.2023, a public hearing was held on 28.08.2023, and the Commission finalised the 2024 Regulations after considering stakeholder objections; Annexures I and II list commenters and hearing participants (p3).

Pages 4–40 are the core of the supplied portion: a regulation-by-regulation SoR. For each draft provision, it sets out stakeholder comments and the Commission's decision, often quoting the final or modified regulation text. It deals with Regulation 3 definitions—banking, captive generating plant, entity, existing open access consumer, green energy/renewable energy, green energy open access consumer, installation, month and State Nodal Agency (p4–15); Regulation 4 interpretation (p15–16); Regulation 5 scope (p16–17); Regulation 6 criteria for allowing GEOA, including planning-code compliance, network margins, metering and no-dues conditions (p17–19); Regulation 7 categories of long-term, medium-term and short-term open access (p19–23); Regulation 8 application procedure and the undertaking against multiple PPAs, with a modification allowing a drawee entity multiple PPAs within the granted quantum (p23–29); and Regulation 9 eligibility, captive-status verification, the 100 kW threshold for non-captive consumers and no load limit for captive use (p29–40). The portion ends mid-discussion of banking charges and scheduling.

Standard name
Green Energy Open Access Regulations
Primary topics
Green energy open access, Open access, Energy banking

Read with this

The regulation

Procedures and orders made under it

Earlier drafts

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document