Green Energy Open Access Regulations, 2024 — Third Amendment, 2025

Gujarat Electricity Regulatory Commission (Terms & Conditions for Green Energy Open Access) (Third Amendment) Regulations, 2025

AmendmentDated 24 Sep 2025Published in the Gazette 25 Sep 2025Notification No. 08 of 2025 dated 24/09/2025

Amends the Green Energy Open Access Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Third Amendment to the GERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024, issued as Notification No. 08 of 2025 and published in the Gujarat Government Gazette (Extraordinary, Part IV-C) on 25 September 2025 (p1). It is a short, two-clause operative instrument that touches only the banking charge regime of the principal regulations.

Clause 1 gives the short title, extends the regulations to the whole of Gujarat and brings them into force from the date of gazette publication (p1). Clause 2 substitutes Regulation 1(4) of the principal regulations so that the banking charge under Regulation 17.6 has a defined life: it applies from the date of notification of these regulations up to 31 March 2026, or an earlier date if the Commission notifies such charges through a separate notification or regulation (p2).

Clause 3 substitutes Regulation 17.6(viii) and fixes the banking charge itself at Rs. 1.50 per unit, running from the notification date to 31 March 2026 or the earlier separate notification, after which the charge for the subsequent period is to be governed by the Commission's separately notified regulations (p2). The substantive effect is a time-boxed continuation of a stated banking charge rate for green energy open access consumers, with the Commission reserving the right to replace it earlier. There is no other change to eligibility, procedure or the wider open access framework.

Standard name
Green Energy Open Access Regulations
Primary topics
Green energy open access, Energy banking

Read with this

The regulation

Procedures and orders made under it

Earlier drafts

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document