Skip to content

GERC · Gujarat Electricity Regulatory Commission

Green Energy Open Access Regulations, 2024 — First Amendment, 2024 — Draft

Gujarat Electricity Regulatory Commission (Terms & Conditions for Green Energy Open Access) (First Amendment) Regulations, 2024

Draft amendmentDated 31 Aug 2024

Draft

A proposal that has since been finalised as the Green Energy Open Access (First Amendment) Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A two-page draft amendment by which the Gujarat Electricity Regulatory Commission proposes to rewrite the banking-charge provisions of its Green Energy Open Access Regulations, 2024 (Notification No. 8 of 2024, the "Principal Regulations").

Clause 1 is the formal opening: short title, extension to the whole of Gujarat, and commencement from the date of publication in the Official Gazette (p1). Clause 2 substitutes clause 1(4) of the Principal Regulations so that the banking charge in Regulation 17.6 runs from the date of notification of these Regulations until 31 March 2025, or such earlier date as the Commission notifies the charges by separate notification (p1–2). Clause 3 substitutes Regulation 17.6(viii) — the operative banking provision — to the same effect, setting the banking charge at Rs. 1.50 per unit for that period and leaving the charge thereafter to a separate notification (p2).

So the substance is a rate plus a sunset: the rate is fixed only for a defined window, and the Commission keeps the option to replace it earlier. The document is signed by the Secretary, dated 31 August 2024 at Gandhinagar, is presented as a draft made after previous publication, and carries a blank notification number (p1–2).

Standard name
Green Energy Open Access Regulations
Primary topics
Energy banking

Read with this

The regulation

Procedures and orders made under it

Earlier drafts

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document