Skip to content

GERC · Gujarat Electricity Regulatory Commission

Green Energy Open Access (First Amendment) Regulations, 2024

Gujarat Electricity Regulatory Commission (Terms & Conditions for Green Energy Open Access) (First Amendment) Regulations, 2024

AmendmentDated 23 Sep 2024Published in the Gazette 23 Sep 2024Notification No. 16 of 2024 (GERC/2024/16/Legal/1807) dated 23/09/2024

Amends the Green Energy Open Access Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short GERC amendment to its Green Energy Open Access Regulations, 2024 (Notification No. 8 of 2024, the "Principal Regulations"), published in the Gujarat Government Gazette on 23 September 2024 and in force from that publication date (p1–2). It extends to the whole of Gujarat and substitutes two provisions.

Clause 1(4) of the Principal Regulations is replaced so that the banking charge under Regulation 17.6 runs from the date of this notification up to 31 March 2025, or an earlier date on which the Commission notifies such charges through a separate regulation (p2).

Regulation 17.6(viii) is replaced to state the banking charge itself — Rs. 1.50 per unit — for the same window, with the rate for any later period left to a separate notification by the Commission (p2).

The amendment does not restate banking mechanics, eligibility or open-access procedure; those remain in the Principal Regulations. Read it as a time-boxed rate and validity change, with the post-March 2025 rate deliberately left open.

Standard name
Green Energy Open Access Regulations
Primary topics
Green energy open access, Energy banking

Read with this

The regulation

Procedures and orders made under it

Earlier drafts

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document