Skip to content

GERC · Gujarat Electricity Regulatory Commission

Terms and Conditions for Green Energy Open Access Regulations, 2024 — Third Amendment, 2025 — Explanatory Memorandum — Draft

Explanatory Memorandum

Explanatory memorandum to a draftDated 30 Aug 2025

Draft

The draft has since been finalised as the Green Energy Open Access Regulations, 2024 — Third Amendment, 2025.

Explanatory memorandum to the Green Energy Open Access Regulations, 2024 — Third Amendment, 2025 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is GERC's explanatory memorandum for the draft Gujarat Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) (Third Amendment) Regulations, 2025 — a two-page note explaining why a further extension of the green-energy open access banking charge is proposed (p1–2).

Pages 1–2 set out the existing position. Regulation 1(4) and Regulation 17.6(viii) of the GERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 — notified by Notification No. 08 of 2024 dated 21.02.2024 — fix a banking charge of Rs. 1.50 per unit effective from notification up to 30 September 2024, with later rates to be decided by the Commission through a separate notification (p1). The memorandum records that the First Amendment Regulations, 2024 and the Second Amendment Regulations, 2025 continued the same Rs. 1.50 per unit rate up to 30 September 2025 because a study to settle a banking-charge framework was still running (p1).

It then states that the study is still in progress and needs more time for collection, compilation and analysis of voluminous data (p1), and proposes to continue the existing Rs. 1.50 per unit charge up to 31 March 2026, or an earlier date if the Commission notifies charges separately (p2). The draft amended text of Regulation 1(4) and Regulation 17.6(viii) is reproduced, providing that banking charges from 1 April 2026 onwards will be as decided by the Commission by separate notification (p2).

Standard name
Green Energy Open Access Regulations
Primary topics
Energy banking

Read with this

The regulation

Procedures and orders made under it

Earlier drafts

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document