Skip to content

GERC · Gujarat Electricity Regulatory Commission

Green Energy Open Access Regulations, 2024 — Fifth Amendment, 2026 — Statement of Reasons

Gujarat Electricity Regulatory Commission (Terms & Conditions For Green Energy Open Access) (Fifth Amendment) Regulations, 2026

Statement of reasonsDated 30 Jun 2026

The commission's reasons for the Green Energy Open Access Regulations, 2024 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is GERC's Statement of Reasons for the Fifth Amendment to its Green Energy Open Access (GEOA) Regulations, 2024, signed at Gandhinagar on 30/06/2026 (p8). It is a reasons document, not a fresh charging framework: its single subject is a short extension of the existing interim banking charge.

Section 1 (pp1–2) recaps the amendment chain — the Principal Regulations of 21.02.2024 and the First to Fourth Amendments — and quotes the current Clause 1(4) and Regulation 17.6(viii), under which the Rs. 1.50 per unit banking charge runs only to 30th June 2026 or the earlier date of a separate notification. Because the study on a banking-charge framework is still incomplete, the Commission proposes to substitute both provisions so the same charge continues to 31st August 2026, or earlier if notified separately.

Section 2 (p3) records the consultation: the draft Fifth Amendment of 06.06.2026, public notices on 07.06.2026, a public hearing on 22.06.2026, and a table of seven stakeholders with written and oral submissions.

Section 3 (pp3–8) sets out stakeholder objections and the Commission's rulings on each: replacing Rs. 1.50/unit with an in-kind adjustment of 8% of energy banked (rejected — outside the scope, and a draft Sixth Amendment on methodology is already out for consultation); the repeated extension of an interim arrangement (accepted as transitional, needed to avoid a regulatory vacuum); absence of a cost-based determination and the thin Explanatory Memorandum (the cost-reflective principle is accepted, the dedicated study is at consultation stage); and the alleged departure from the Forum of Regulators' model regulation and Article 254 (the model is recommendatory; the State charge stands). Item (v) lists nine further requests on metering, LT-level energy accounting, standby and relinquishment charges, charge stability and banked-energy quantum, all held out of scope. Section 4 directs the amendment to the Official Gazette (p8).

Standard name
Green Energy Open Access Regulations
Primary topics
Green energy open access, Energy banking, Open access charges

Read with this

The regulation

Procedures and orders made under it

Earlier drafts

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗