GERC · Gujarat Electricity Regulatory Commission
Green Energy Open Access Regulations, 2024 — Fifth Amendment, 2026 — Statement of Reasons
Gujarat Electricity Regulatory Commission (Terms & Conditions For Green Energy Open Access) (Fifth Amendment) Regulations, 2026
Statement of reasonsDated 30 Jun 2026
The commission's reasons for the Green Energy Open Access Regulations, 2024 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is GERC's Statement of Reasons for the Fifth Amendment to its Green Energy Open Access (GEOA) Regulations, 2024, signed at Gandhinagar on 30/06/2026 (p8). It is a reasons document, not a fresh charging framework: its single subject is a short extension of the existing interim banking charge.
Section 1 (pp1–2) recaps the amendment chain — the Principal Regulations of 21.02.2024 and the First to Fourth Amendments — and quotes the current Clause 1(4) and Regulation 17.6(viii), under which the Rs. 1.50 per unit banking charge runs only to 30th June 2026 or the earlier date of a separate notification. Because the study on a banking-charge framework is still incomplete, the Commission proposes to substitute both provisions so the same charge continues to 31st August 2026, or earlier if notified separately.
Section 2 (p3) records the consultation: the draft Fifth Amendment of 06.06.2026, public notices on 07.06.2026, a public hearing on 22.06.2026, and a table of seven stakeholders with written and oral submissions.
Section 3 (pp3–8) sets out stakeholder objections and the Commission's rulings on each: replacing Rs. 1.50/unit with an in-kind adjustment of 8% of energy banked (rejected — outside the scope, and a draft Sixth Amendment on methodology is already out for consultation); the repeated extension of an interim arrangement (accepted as transitional, needed to avoid a regulatory vacuum); absence of a cost-based determination and the thin Explanatory Memorandum (the cost-reflective principle is accepted, the dedicated study is at consultation stage); and the alleged departure from the Forum of Regulators' model regulation and Article 254 (the model is recommendatory; the State charge stands). Item (v) lists nine further requests on metering, LT-level energy accounting, standby and relinquishment charges, charge stability and banked-energy quantum, all held out of scope. Section 4 directs the amendment to the Official Gazette (p8).
Read with this
The regulation
- Dated 20 Feb 2024Green Energy Open Access Regulations, 2024
Amendments and corrections
- Dated 23 Sep 2024Green Energy Open Access (First Amendment) Regulations, 2024
- Dated 28 Mar 2025Green Energy Open Access Regulations, 2024 — Second Amendment, 2025
- Dated 24 Sep 2025Green Energy Open Access Regulations, 2024 — Third Amendment, 2025
- Dated 30 Mar 2026Green Energy Open Access Regulations, 2024 — Fourth Amendment, 2026
- Dated 30 Jun 2026Green Energy Open Access Regulations, 2024 — Fifth Amendment, 2026
- Dated 19 Aug 2026Green Energy Open Access Regulations, 2024 — Sixth Amendment, 2026
- Dated 24 Sep 2026Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Errata
Commencement notices and reasons
- Dated 20 Feb 2024Green Energy Open Access Regulations, 2024 — Statement of Reasons
- Dated 23 Sep 2024Green Energy Open Access Regulations, 2024 — First Amendment — Statement of Reasons
- Dated 28 Mar 2025Green Energy Open Access Regulations, 2024 — Second Amendment, 2025 — Statement of Reasons
- Dated 25 Sep 2025Green Energy Open Access Regulations, 2024 — Third Amendment, 2025 — Statement of Reasons
- Dated 30 Mar 2026Green Energy Open Access Regulations, 2024 — Fourth Amendment, 2026 — Statement of Reasons
- Dated 19 Aug 2026Green Energy Open Access Regulations, 2024 — Sixth Amendment, 2026 — Statement of Reasons
Procedures and orders made under it
Earlier drafts
- Dated 23 Jun 2023Green Energy Open Access Regulations, 2023 — Draft
- Dated 31 Aug 2024Green Energy Open Access Regulations, 2024 — First Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Green Energy Open Access (First Amendment) Regulations, 2024 — Explanatory Note — Draft
- Dated 23 Jan 2025Green Energy Open Access Regulations, 2024 — Second Amendment, 2025 — Draft
- Dated 30 Aug 2025Green Energy Open Access Regulations, 2024 — Third Amendment, 2025 — Draft
- Dated 30 Aug 2025Explanatory memorandum: Terms and Conditions for Green Energy Open Access Regulations, 2024 — Third Amendment, 2025 — Explanatory Memorandum — Draft
- Dated 11 Mar 2026Terms & Conditions for Green Energy Open Access (Fourth Amendment) Regulations, 2026 — Draft
- Dated 11 Mar 2026Explanatory memorandum: Green Energy Open Access (Fourth Amendment) Regulations, 2026 — Explanatory Memorandum — Draft
- Dated 6 Jun 2026Green Energy Open Access (Fifth Amendment) Regulations, 2026 — Draft
- Dated 6 Jun 2026Explanatory memorandum: Green Energy Open Access Regulations, 2024 — Fifth Amendment, 2026 — Explanatory Memorandum — Draft
- Dated 20 Jun 2026Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Draft
- Dated 20 Jun 2026File: Consultation Paper — Methodology for Determination of Banking Charges for RE Open Access Consumers under Green Energy Open Access Regulations, 2024
- Dated 20 Jun 2026Explanatory memorandum: Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Explanatory Memorandum — Draft
5 more documents belong here and are not on Voltaic: 5 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.