Green Energy Open Access (First Amendment) Regulations, 2024 — Explanatory Note — Draft

Explanatory Note for Draft Gujarat Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) (First Amendment) Regulations, 2024

Explanatory memorandum to a draftDated 31 Aug 2024

Draft

The draft has since been finalised as the Green Energy Open Access (First Amendment) Regulations, 2024.

Explanatory memorandum to the Green Energy Open Access Regulations, 2024 — First Amendment, 2024 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

Page 1 opens by identifying the Gujarat Electricity Regulatory Commission (GERC) and the instrument it explains: the draft GERC (Terms and Conditions for Green Energy Open Access) (First Amendment) Regulations, 2024. It recalls that the principal GERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 were notified by Notification No.08 of 2024 dated 21.02.2024. The note then quotes the existing Regulation 1(4) and Regulation 17.6(viii), which made a banking charge of Rs. 1.50 per unit effective from notification until 30 September 2024, with charges from 1 October 2024 onward to be set by separate notification. It explains that GERC has begun a study on a banking-charge framework and that the study is still in progress; to avoid a gap, it proposes to continue the existing Rs. 1.50 per unit charge for six more months.

Page 2 sets out the proposed amended text. The revised Regulation 1(4) would make the banking charge effective from notification of the amending Regulations until 31 March 2025 or an earlier date on which the Commission notifies separate charges. The revised Regulation 17.6(viii) would keep the Rs. 1.50 per unit rate for that period, with banking charges from 1 April 2025 onward to be decided and separately notified. The document ends with a separator and does not reproduce the full principal Regulations or any other amendments. It is an explanatory note for a draft amendment, not the notified amendment itself.

Standard name
Green Energy Open Access Regulations
Primary topics
Energy banking

Read with this

The regulation

Procedures and orders made under it

Earlier drafts

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document