Green Energy Open Access Regulations, 2024 — Fifth Amendment, 2026 — Explanatory Memorandum — Draft

Explanatory Memorandum for Draft Gujarat Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) (Fifth Amendment) Regulations, 2026

Explanatory memorandum to a draftDated 6 Jun 2026

Draft

The draft has since been finalised as the Green Energy Open Access Regulations, 2024 — Fifth Amendment, 2026.

Explanatory memorandum to the Green Energy Open Access (Fifth Amendment) Regulations, 2026 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is the Gujarat Electricity Regulatory Commission's explanatory memorandum for the draft GERC (Terms and Conditions for Green Energy Open Access) (Fifth Amendment) Regulations, 2026 (p1). It is a two-page rationale-and-draft-text note, not the notified amendment itself.

Page 1 recalls that the Principal Regulations — GERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024, notified by Notification No. 08 of 2024 dated 21.02.2024 — set a banking charge of Rs. 1.50 per unit effective up to 30.09.2024, with later banking charges to be decided by separate notification (p1). It then records that four successive amendment regulations in 2024 and 2025 continued the same charge up to 31.05.2025, 30.09.2025, 31.03.2026 and 30.06.2026 respectively, because a study to determine a banking-charge framework was ongoing (p1). The memorandum says that study still needs more time and proposes to continue the existing charge until 30.06.2026 or an earlier date notified by the Commission (p1).

Page 2 contains the proposed replacement text for Regulation 1(4) and Regulation 17.6(viii) of the Principal Regulations. Both drafts would make the Rs. 1.50 per unit banking charge effective from the date of notification of these Regulations up to 31 August 2026, or an earlier date on which the Commission notifies such charges separately; after that, the separately notified banking charge applies (p2). The memorandum gives no notification number, issue date or Gazette date, and does not include the full text of the draft Fifth Amendment Regulations.

Standard name
Green Energy Open Access Regulations
Primary topics
Energy banking

Read with this

The regulation

Procedures and orders made under it

Earlier drafts

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document