GERC · Gujarat Electricity Regulatory Commission

Green Energy Open Access Regulations, 2024 — Second Amendment, 2025 — Draft

Gujarat Electricity Regulatory Commission (Terms & Conditions for Green Energy Open Access) (Second Amendment) Regulations, 2025

Draft amendmentDated 23 Jan 2025

Draft

A proposal that has since been finalised as the Green Energy Open Access Regulations, 2024 — Second Amendment, 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A short, two-clause amendment from the Gujarat Electricity Regulatory Commission (GERC) to its 2024 Green Energy Open Access Regulations. It is made under sections 39, 40, 42, 61 and 86 read with section 181 of the Electricity Act, 2003 and extends to the whole of Gujarat (p1).

Clause 3 substitutes Clause 1(4) of the Principal Regulations so that the banking charge under Regulation 17.6 runs from the date of notification of these Regulations until 30 September 2025, or an earlier date on which the Commission notifies such charges by a separate regulation (p1–2). Clause 4 substitutes Regulation 17.6(viii) of the banking-facility regulation, setting the banking charge at Rs. 1.50 per unit for the same window and leaving the charge for any later period to that separate notification (p2).

The instrument is titled 'Draft', carries a blank notification number, and comes into force on publication in the Official Gazette, whose date is not given (p1). It is dated 23/01/2025 and signed by the Secretary (p2). Both substituted provisions are expressly interim: the rate and its end date are the whole content, and the post-September regime is deferred to a later instrument.

Standard name
Green Energy Open Access Regulations
Primary topics
Energy banking

Read with this

The regulation

Procedures and orders made under it

Earlier drafts

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document