Skip to content

GERC · Gujarat Electricity Regulatory Commission

Green Energy Open Access Regulations, 2024 — Third Amendment, 2025 — Draft

Gujarat Electricity Regulatory Commission (Terms & Condi;ons for Green Energy Open Access) (Third Amendment) Regula;ons, 2025.

Draft amendmentDated 30 Aug 2025No. -- of 2025 dated 30/08/2025

Draft

A proposal that has since been finalised as the Green Energy Open Access Regulations, 2024 — Third Amendment, 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft amendment — issued after previous publication — to the Gujarat Electricity Regulatory Commission's Green Energy Open Access Regulations, 2024, and it is confined to the banking charge. It is signed by the Commission's Secretary at Gandhinagar on 30/08/2025 and extends to the whole of Gujarat (p1–2).

The operative content is two substitutions. Paragraph 2 replaces Regulation 1(4) of the Principal Regulations so that the banking charge provided in Regulation 17.6 is effective from the date of notification of these Regulations up to 31st March 2026, with the charge for the period from 1st April 2026 onwards to be decided by the Commission through a separate notification (p1). Paragraph 3 replaces Regulation 17.6(viii), setting the banking charge at Rs. 1.50 per unit for the same window and repeating that the later rate will be separately notified (p2).

Paragraph 1 gives the short title, states the territorial extent and provides for commencement on publication in the Official Gazette (p1). The two substitution clauses are the whole of the operative text: one governs the effect and expiry of the charge, the other fixes the rate. Apart from the enabling recital and the signature block, nothing else is addressed, and the notification number is left blank as "No. -- of 2025" (p1).

Standard name
Green Energy Open Access Regulations
Primary topics
Energy banking

Read with this

The regulation

Procedures and orders made under it

Earlier drafts

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document