GERC · Gujarat Electricity Regulatory Commission
Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Explanatory Memorandum — Draft
Explanatory Memorandum For Draft Gujarat Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) (Sixth Amendment) Regulations, 2026
Explanatory memorandum to a draftDated 20 Jun 2026
Draft
The draft has since been finalised as the Green Energy Open Access Regulations, 2024 — Sixth Amendment, 2026.
Explanatory memorandum to the Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
GERC's Explanatory Memorandum supports the draft Gujarat Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) (Sixth Amendment) Regulations, 2026, issued for stakeholder consultation along with a Consultation Paper (p1–2). It recounts the 2024 Principal Regulations' banking charge of Rs. 1.50 per unit, which applied up to 30.09.2024, and the First to Fifth Amendments that extended it to 31.05.2025, 30.09.2025, 31.03.2026, 30.06.2026 and 31.08.2026 while the Commission studied a banking-charge methodology (p1).
The main proposal is to amend Regulation 1(4) of the Principal Regulations to set an interim banking charge of Rs. 1.00 per unit from 01.09.2026 to 31.03.2027, with future charges determined under Regulation 17.6 and Annexure-I (p2). The document explains that the Rs 1.00 figure is based on an Annexure-I calculation of Rs 1.06 per unit using limited data from state-owned discoms, rounded down, and that the same charge would apply to all Distribution Licensees for the interim period because other licensees either did not submit data or have no Green Energy Open Access consumers (p2).
It also proposes to amend Regulation 17.6(viii) so that banking charges are computed under the Annexure-I methodology until 31.03.2027 and thereafter determined annually from 1 April 2027 based on data for the preceding calendar year (p3). Six provisos are proposed: the first requires all Distribution Licensees to maintain and submit complete, accurate and sufficient data by affidavit, with possible SLDC verification (p3–4); the second to fourth allow common banking charges for groups of licensees, including state-owned discoms, small licensees, private licensees with common procurement, and SEZ/SIR/Port/new licensees (p4–5); the fifth sets a floor and ceiling and makes the charge 'Nil' if data is not provided (p5–6); the sixth treats 1 paisa per unit per annum of energy handled as deemed revenue for a Nil-charge licensee and adjusts it in ARR (p6–7). Annexure-I is the Consultation Paper on methodology (p8).
Read with this
The regulation
- Dated 20 Feb 2024Green Energy Open Access Regulations, 2024
Amendments and corrections
- Dated 23 Sep 2024Green Energy Open Access (First Amendment) Regulations, 2024
- Dated 28 Mar 2025Green Energy Open Access Regulations, 2024 — Second Amendment, 2025
- Dated 24 Sep 2025Green Energy Open Access Regulations, 2024 — Third Amendment, 2025
- Dated 30 Mar 2026Green Energy Open Access Regulations, 2024 — Fourth Amendment, 2026
- Dated 30 Jun 2026Green Energy Open Access Regulations, 2024 — Fifth Amendment, 2026
- Dated 19 Aug 2026Green Energy Open Access Regulations, 2024 — Sixth Amendment, 2026
- Dated 24 Sep 2026Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Errata
Commencement notices and reasons
- Dated 20 Feb 2024Green Energy Open Access Regulations, 2024 — Statement of Reasons
- Dated 23 Sep 2024Green Energy Open Access Regulations, 2024 — First Amendment — Statement of Reasons
- Dated 28 Mar 2025Green Energy Open Access Regulations, 2024 — Second Amendment, 2025 — Statement of Reasons
- Dated 25 Sep 2025Green Energy Open Access Regulations, 2024 — Third Amendment, 2025 — Statement of Reasons
- Dated 30 Mar 2026Green Energy Open Access Regulations, 2024 — Fourth Amendment, 2026 — Statement of Reasons
- Dated 30 Jun 2026Green Energy Open Access Regulations, 2024 — Fifth Amendment, 2026 — Statement of Reasons
- Dated 19 Aug 2026Green Energy Open Access Regulations, 2024 — Sixth Amendment, 2026 — Statement of Reasons
Procedures and orders made under it
Earlier drafts
- Dated 23 Jun 2023Green Energy Open Access Regulations, 2023 — Draft
- Dated 31 Aug 2024Green Energy Open Access Regulations, 2024 — First Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Green Energy Open Access (First Amendment) Regulations, 2024 — Explanatory Note — Draft
- Dated 23 Jan 2025Green Energy Open Access Regulations, 2024 — Second Amendment, 2025 — Draft
- Dated 30 Aug 2025Green Energy Open Access Regulations, 2024 — Third Amendment, 2025 — Draft
- Dated 30 Aug 2025Explanatory memorandum: Terms and Conditions for Green Energy Open Access Regulations, 2024 — Third Amendment, 2025 — Explanatory Memorandum — Draft
- Dated 11 Mar 2026Terms & Conditions for Green Energy Open Access (Fourth Amendment) Regulations, 2026 — Draft
- Dated 11 Mar 2026Explanatory memorandum: Green Energy Open Access (Fourth Amendment) Regulations, 2026 — Explanatory Memorandum — Draft
- Dated 6 Jun 2026Green Energy Open Access (Fifth Amendment) Regulations, 2026 — Draft
- Dated 6 Jun 2026Explanatory memorandum: Green Energy Open Access Regulations, 2024 — Fifth Amendment, 2026 — Explanatory Memorandum — Draft
- Dated 20 Jun 2026Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Draft
- Dated 20 Jun 2026File: Consultation Paper — Methodology for Determination of Banking Charges for RE Open Access Consumers under Green Energy Open Access Regulations, 2024
5 more documents belong here and are not on Voltaic: 5 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.