Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Explanatory Memorandum — Draft

Explanatory Memorandum For Draft Gujarat Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) (Sixth Amendment) Regulations, 2026

Explanatory memorandum to a draftDated 20 Jun 2026

Draft

The draft has since been finalised as the Green Energy Open Access Regulations, 2024 — Sixth Amendment, 2026.

Explanatory memorandum to the Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

GERC's Explanatory Memorandum supports the draft Gujarat Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) (Sixth Amendment) Regulations, 2026, issued for stakeholder consultation along with a Consultation Paper (p1–2). It recounts the 2024 Principal Regulations' banking charge of Rs. 1.50 per unit, which applied up to 30.09.2024, and the First to Fifth Amendments that extended it to 31.05.2025, 30.09.2025, 31.03.2026, 30.06.2026 and 31.08.2026 while the Commission studied a banking-charge methodology (p1).

The main proposal is to amend Regulation 1(4) of the Principal Regulations to set an interim banking charge of Rs. 1.00 per unit from 01.09.2026 to 31.03.2027, with future charges determined under Regulation 17.6 and Annexure-I (p2). The document explains that the Rs 1.00 figure is based on an Annexure-I calculation of Rs 1.06 per unit using limited data from state-owned discoms, rounded down, and that the same charge would apply to all Distribution Licensees for the interim period because other licensees either did not submit data or have no Green Energy Open Access consumers (p2).

It also proposes to amend Regulation 17.6(viii) so that banking charges are computed under the Annexure-I methodology until 31.03.2027 and thereafter determined annually from 1 April 2027 based on data for the preceding calendar year (p3). Six provisos are proposed: the first requires all Distribution Licensees to maintain and submit complete, accurate and sufficient data by affidavit, with possible SLDC verification (p3–4); the second to fourth allow common banking charges for groups of licensees, including state-owned discoms, small licensees, private licensees with common procurement, and SEZ/SIR/Port/new licensees (p4–5); the fifth sets a floor and ceiling and makes the charge 'Nil' if data is not provided (p5–6); the sixth treats 1 paisa per unit per annum of energy handled as deemed revenue for a Nil-charge licensee and adjusts it in ARR (p6–7). Annexure-I is the Consultation Paper on methodology (p8).

Standard name
Green Energy Open Access Regulations
Primary topics
Energy banking, Green energy open access, ARR and true-up

Read with this

The regulation

Procedures and orders made under it

Earlier drafts

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.