Skip to content

GERC · Gujarat Electricity Regulatory Commission

Green Energy Open Access Regulations, 2024 — Sixth Amendment, 2026

Gujarat Electricity Regulatory Commission (Terms & Conditions for Green Energy Open Access) (Sixth Amendment) Regulations, 2026

AmendmentDated 19 Aug 2026Published in the Gazette 19 Aug 2026GERC/2026/07/Tariff/1668 dated 19th August, 2026

Amends the Green Energy Open Access Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Gujarat Electricity Regulatory Commission's Sixth Amendment to its 2024 Green Energy Open Access Regulations, gazetted on 19 August 2026, does two things: it resets the banking-charge regime for green-energy open access consumers and prints, as Annexure-I, the step-by-step methodology by which those charges are computed (p1–3, p3–10).

Clause 1 gives the short title, extends the amendment to the whole of Gujarat, and brings it into force on publication in the Official Gazette — 19 August 2026 (p1).

Clause 2 substitutes Regulation 1(4) of the Principal Regulations: the banking charge stands at Rs. 1.00 per unit from 1 September 2026 to 31 March 2027; from 1 April 2027 it is to be determined under Regulation 17.6 as amended; and where it cannot be so determined, the Commission may by separate order continue the existing charge (p2).

Clause 3 substitutes Regulation 17.6(viii). Charges computed by the Commission from the Annexure-I methodology and discom data remain applicable until 31 March 2027; from 1 April 2027 they are re-determined each financial year from the immediately preceding calendar year's data supplied by distribution licensees. Provisos require licensees to furnish complete and accurate data on affidavit in a Commission-specified format (verifiable through SLDC), permit common charges for the four state-owned discoms, for small and common-procurement private licensees, and for SEZ/SIR/port licensees, cap variation between a floor of Rs. 0.50 per unit and a ceiling of Rs. 1.50 per unit where data is adequate, and make charges 'Nil' for licensees that fail to supply data — with deemed revenue of 1 paisa per unit per annum adjusted in the ARR so consumers do not bear the consequence (p2–3).

Annexure-I (p3–10) is the computation manual: a nomenclature of symbols; Step 1 slot-wise and cumulative (FIFO, peak and off-peak) banked-energy computation with lapsed energy; Step 2 consolidation across all RE open access consumers in a licensee's area; Step 3 slot-wise cost and revenue computation under four scenarios turning on the IEX market clearing price versus the marginal thermal station's variable cost, with prescribed IEX and BESS actions; and Step 4 aggregation into Banking Charges = Aggregate Net Revenue / Total Banked Energy over the monthly billing cycle (p7, p10).

Standard name
Green Energy Open Access Regulations
Primary topics
Energy banking, Green energy open access, Energy storage deployment

Read with this

The regulation

Procedures and orders made under it

Earlier drafts

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document