Skip to content

GERC · Gujarat Electricity Regulatory Commission

Green Energy Open Access (Fifth Amendment) Regulations, 2026 — Draft

Gujarat Electricity Regulatory Commission (Terms & Conditions for Green Energy Open Access) (Fifth Amendment) Regulations, 2026

Draft amendmentDated 6 Jun 2026

Draft

A proposal that has since been finalised as the Green Energy Open Access Regulations, 2024 — Fifth Amendment, 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft amendment by the Gujarat Electricity Regulatory Commission to its Green Energy Open Access Regulations, 2024 (Principal Regulations). It is made under Sections 39, 40, 42, 61 and 86 read with Section 181 of the Electricity Act, 2003 (p1).

Clause 1 gives the short title, extends the amendment to the whole of Gujarat, and says it comes into force on publication in the Official Gazette (p1). Clause 2 substitutes Regulation 1(4) of the Principal Regulations so that the banking charge in Regulation 17.6 is effective from the date of notification of these Regulations until 31 August 2026, or an earlier date on which the Commission notifies such charges through a separate notification of Regulation (p1).

Clause 3 substitutes Regulation 17.6(viii), setting the banking charge at Rs. 1.50 per unit for that period; after that, the banking charge will be as per a separate notification by the Commission (p1–2). The document is signed by the Secretary and dated 06/06/2026 at Gandhinagar; the notification number is left blank (p2).

Standard name
Green Energy Open Access Regulations
Primary topics
Energy banking

Read with this

The regulation

Procedures and orders made under it

Earlier drafts

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document