GERC · Gujarat Electricity Regulatory Commission

Green Energy Open Access (Fourth Amendment) Regulations, 2026 — Explanatory Memorandum — Draft

Explanatory Memorandum for Draft Gujarat Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) (Fourth Amendment) Regulations, 2026

Explanatory memorandum to a draftDated 11 Mar 2026

Draft

The draft has since been finalised as the Green Energy Open Access Regulations, 2024 — Fourth Amendment, 2026.

Explanatory memorandum to the Terms & Conditions for Green Energy Open Access (Fourth Amendment) Regulations, 2026 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Commission's explanatory memorandum for a draft fourth amendment to its Green Energy Open Access Regulations. It is a short, two-page justification document: page 1 recites the background and the reason for the proposal, page 2 reproduces the exact text proposed to be substituted.

The Principal Regulations, 2024 (Notification No. 08 of 2024 dated 21.02.2024) made the banking charge of Rs. 1.50 per unit effective only up to 30 September 2024, leaving the charge thereafter to be fixed by a separate notification (p1). Three successive amendment regulations extended that same Rs. 1.50 per unit rate — to 31 May 2025, 30 September 2025 and 31 March 2026 respectively — while the Commission's study to build a banking-charge framework was under way (p1).

The memorandum states that the study is still in process, involves collection and analysis of voluminous data, and needs more time. It therefore proposes to continue the existing banking charge of Rs. 1.50 per unit until 30 June 2026, or an earlier date on which the Commission notifies such charges separately (p1). Page 2 sets out the proposed revised wording of Regulation 1(4) and Regulation 17.6(viii), which would replace the earlier sunset dates with the new one and leave the post-extension charge to be fixed by a separate notification.

Nothing in the document changes the banking charge itself or its framework; it is only about extending the existing rate to a new deadline.

Standard name
Green Energy Open Access Regulations
Primary topics
Energy banking

Read with this

The regulation

Procedures and orders made under it

Earlier drafts

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.