Green Energy Open Access Regulations, 2024 — Third Amendment, 2025 — Statement of Reasons

Gujarat Electricity Regulatory Commission (Terms and Condi=ons for Green Energy Open Access) (Third Amendment) Regula=ons, 2025.

Statement of reasonsDated 25 Sep 2025

The commission's reasons for the Green Energy Open Access Regulations, 2024 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Gujarat Electricity Regulatory Commission's Statement of Reasons (SOR) for the Gujarat Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) (Third Amendment) Regulations, 2025, signed at Gandhinagar on 25.09.2025 (p6). It explains why the Commission proposes to extend the existing banking charge for Green Energy Open Access consumers instead of moving to the Forum of Regulators' recommended charge in kind.

The background recounts the Principal Regulations notified on 21.02.2024 (Notification No. 08 of 2024), the First Amendment on 23.09.2024 (Notification No. 16 of 2024) and the Second Amendment on 28.03.2025 (Notification No. 06 of 2025). It reproduces the existing clauses 1(4) and 17.6(viii), under which the banking charge of Rs. 1.50 per unit was to run until 30.09.2025, and says a study to determine a banking-charge framework is under way (p1–3).

The consultation process records the draft Third Amendment Regulations dated 30.08.2025, public notices in two Gujarati dailies on 31.08.2025 and one English daily on 01.09.2025, and a public hearing on 15.09.2025 (p3). Stakeholders asked for an 8% in-kind banking charge per the Forum of Regulators, questioned the lack of study behind Rs. 1.50 per unit, and raised cost-recovery and CUF/PLF comparison issues. One stakeholder sought unrelated changes — ToU-slot accounting, removal of transaction and meter-reading charges, waiver of standby charges, surrender of transmission rights without relinquishment charges, and smart meters (p3–6).

The Commission decides to continue the existing banking charge for a further six months, up to 31.03.2026 or an earlier notification of new charges, pending the ongoing study; the unrelated suggestions are not considered at this stage (p4–6). It directs publication of the Third Amendment Regulations in the Official Gazette (p6). Annexure I lists stakeholders who submitted comments (p7) and Annexure II lists those present at the hearing (p8).

Standard name
Green Energy Open Access Regulations
Primary topics
Green energy open access, Energy banking, Consumer representation

Read with this

The regulation

Procedures and orders made under it

Earlier drafts

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document