Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Gujarat Electricity Regulatory Commission's Statement of Reasons (SOR) for the Gujarat Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) (Third Amendment) Regulations, 2025, signed at Gandhinagar on 25.09.2025 (p6). It explains why the Commission proposes to extend the existing banking charge for Green Energy Open Access consumers instead of moving to the Forum of Regulators' recommended charge in kind.
The background recounts the Principal Regulations notified on 21.02.2024 (Notification No. 08 of 2024), the First Amendment on 23.09.2024 (Notification No. 16 of 2024) and the Second Amendment on 28.03.2025 (Notification No. 06 of 2025). It reproduces the existing clauses 1(4) and 17.6(viii), under which the banking charge of Rs. 1.50 per unit was to run until 30.09.2025, and says a study to determine a banking-charge framework is under way (p1–3).
The consultation process records the draft Third Amendment Regulations dated 30.08.2025, public notices in two Gujarati dailies on 31.08.2025 and one English daily on 01.09.2025, and a public hearing on 15.09.2025 (p3). Stakeholders asked for an 8% in-kind banking charge per the Forum of Regulators, questioned the lack of study behind Rs. 1.50 per unit, and raised cost-recovery and CUF/PLF comparison issues. One stakeholder sought unrelated changes — ToU-slot accounting, removal of transaction and meter-reading charges, waiver of standby charges, surrender of transmission rights without relinquishment charges, and smart meters (p3–6).
The Commission decides to continue the existing banking charge for a further six months, up to 31.03.2026 or an earlier notification of new charges, pending the ongoing study; the unrelated suggestions are not considered at this stage (p4–6). It directs publication of the Third Amendment Regulations in the Official Gazette (p6). Annexure I lists stakeholders who submitted comments (p7) and Annexure II lists those present at the hearing (p8).
Read with this
The regulation
- Dated 20 Feb 2024Green Energy Open Access Regulations, 2024
Amendments and corrections
- Dated 23 Sep 2024Green Energy Open Access (First Amendment) Regulations, 2024
- Dated 28 Mar 2025Green Energy Open Access Regulations, 2024 — Second Amendment, 2025
- Dated 24 Sep 2025Green Energy Open Access Regulations, 2024 — Third Amendment, 2025
- Dated 30 Mar 2026Green Energy Open Access Regulations, 2024 — Fourth Amendment, 2026
- Dated 30 Jun 2026Green Energy Open Access Regulations, 2024 — Fifth Amendment, 2026
- Dated 19 Aug 2026Green Energy Open Access Regulations, 2024 — Sixth Amendment, 2026
- Dated 24 Sep 2026Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Errata
Commencement notices and reasons
- Dated 20 Feb 2024Green Energy Open Access Regulations, 2024 — Statement of Reasons
- Dated 23 Sep 2024Green Energy Open Access Regulations, 2024 — First Amendment — Statement of Reasons
- Dated 28 Mar 2025Green Energy Open Access Regulations, 2024 — Second Amendment, 2025 — Statement of Reasons
- Dated 30 Mar 2026Green Energy Open Access Regulations, 2024 — Fourth Amendment, 2026 — Statement of Reasons
- Dated 30 Jun 2026Green Energy Open Access Regulations, 2024 — Fifth Amendment, 2026 — Statement of Reasons
- Dated 19 Aug 2026Green Energy Open Access Regulations, 2024 — Sixth Amendment, 2026 — Statement of Reasons
Procedures and orders made under it
Earlier drafts
- Dated 23 Jun 2023Green Energy Open Access Regulations, 2023 — Draft
- Dated 31 Aug 2024Green Energy Open Access Regulations, 2024 — First Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Green Energy Open Access (First Amendment) Regulations, 2024 — Explanatory Note — Draft
- Dated 23 Jan 2025Green Energy Open Access Regulations, 2024 — Second Amendment, 2025 — Draft
- Dated 30 Aug 2025Green Energy Open Access Regulations, 2024 — Third Amendment, 2025 — Draft
- Dated 30 Aug 2025Explanatory memorandum: Terms and Conditions for Green Energy Open Access Regulations, 2024 — Third Amendment, 2025 — Explanatory Memorandum — Draft
- Dated 11 Mar 2026Terms & Conditions for Green Energy Open Access (Fourth Amendment) Regulations, 2026 — Draft
- Dated 11 Mar 2026Explanatory memorandum: Green Energy Open Access (Fourth Amendment) Regulations, 2026 — Explanatory Memorandum — Draft
- Dated 6 Jun 2026Green Energy Open Access (Fifth Amendment) Regulations, 2026 — Draft
- Dated 6 Jun 2026Explanatory memorandum: Green Energy Open Access Regulations, 2024 — Fifth Amendment, 2026 — Explanatory Memorandum — Draft
- Dated 20 Jun 2026Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Draft
- Dated 20 Jun 2026File: Consultation Paper — Methodology for Determination of Banking Charges for RE Open Access Consumers under Green Energy Open Access Regulations, 2024
- Dated 20 Jun 2026Explanatory memorandum: Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Explanatory Memorandum — Draft
5 more documents belong here and are not on Voltaic: 5 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.