Skip to content

GERC · Gujarat Electricity Regulatory Commission

Guidelines for Submission of Data for Determination of Banking Charges, 2026

Guidelines for Submission of Data for Determination of Banking Charges

GuidelinesDated 16 Nov 2026Published in the Gazette 17 Nov 2026GERC/2026/12/Tariff/2356 dated 16/11/2026

Made under the Green Energy Open Access Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

GERC's Notification No. 12 of 2026 issues guidelines telling Gujarat's distribution licensees and the State Load Despatch Centre how to file the data the Commission needs in order to fix banking charges for Green Energy Open Access (GEOA) consumers. They are made under the first proviso to Regulation 17.6(viii) of the GERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024, which obliges every distribution licensee to supply complete, accurate and sufficient data, backed by a sworn affidavit, in the manner, format and timelines the Commission specifies (p2).

Paragraphs 1–4 (pp1–3) fix the addressees and the mechanics: quarterly filings for each licence area in the prescribed formats; Excel templates with locked columns; energy taken from ABT-compliant meters as recorded and never averaged, interpolated, estimated or rounded; prescribed units and decimal conventions; missing or faulty meter blocks flagged rather than left blank; consumer identity masked behind a stable Consumer Code, with the code-to-consumer mapping held by the licensee and given only on demand; each RE Source mapped to its consumer with voltage level and injection network, in four extendable column-sets; and monthly consumer bills filed as live Excel workbooks traceable to the block-level data. Paragraphs 5–7 (p3) deal with Nil filings, SLDC's own quarterly Merit Order Despatch returns, and the substantive link: the Commission determines banking charges for the following financial year from the calendar-year data. Paragraphs 8–13 (pp3–4) cover transitional filing on physical media until an online portal is notified, five-year retention, the authorised officer's affidavit, Commission scrutiny and outside verification, the consequence of incomplete data by reference to the fifth and sixth provisos, periodic review of the guidelines, and case-by-case relaxation.

Annexure-A (pp4–14) lays out each format field by field: F-1 licensee profile; F-2 consumer master list; F-3 fifteen-minute injection, consumption and banking data; F-4 Part A generating-station cost and Parts B and C the SLDC's ramping and MOD data; F-5 power exchange DAM and RTM bids; F-6 BESS contracts and block-wise operation; F-7 the wheeling and transmission losses and charges applied in billing, with the formulae for deriving them from approved charges and published losses. Annexure-B (p14) is the affidavit form. No commencement date or validity period is stated; the notification is dated 16 November 2026 and gazetted 17 November 2026.

Standard name
Green Energy Open Access Regulations
Primary topics
Energy banking, Green energy open access, Open access charges

Read with this

The regulation

Earlier drafts

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document