GERC · Gujarat Electricity Regulatory Commission
Guidelines for Submission of Data for Determination of Banking Charges, 2026
Guidelines for Submission of Data for Determination of Banking Charges
GuidelinesDated 16 Nov 2026Published in the Gazette 17 Nov 2026GERC/2026/12/Tariff/2356 dated 16/11/2026
Made under the Green Energy Open Access Regulations, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
GERC's Notification No. 12 of 2026 issues guidelines telling Gujarat's distribution licensees and the State Load Despatch Centre how to file the data the Commission needs in order to fix banking charges for Green Energy Open Access (GEOA) consumers. They are made under the first proviso to Regulation 17.6(viii) of the GERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024, which obliges every distribution licensee to supply complete, accurate and sufficient data, backed by a sworn affidavit, in the manner, format and timelines the Commission specifies (p2).
Paragraphs 1–4 (pp1–3) fix the addressees and the mechanics: quarterly filings for each licence area in the prescribed formats; Excel templates with locked columns; energy taken from ABT-compliant meters as recorded and never averaged, interpolated, estimated or rounded; prescribed units and decimal conventions; missing or faulty meter blocks flagged rather than left blank; consumer identity masked behind a stable Consumer Code, with the code-to-consumer mapping held by the licensee and given only on demand; each RE Source mapped to its consumer with voltage level and injection network, in four extendable column-sets; and monthly consumer bills filed as live Excel workbooks traceable to the block-level data. Paragraphs 5–7 (p3) deal with Nil filings, SLDC's own quarterly Merit Order Despatch returns, and the substantive link: the Commission determines banking charges for the following financial year from the calendar-year data. Paragraphs 8–13 (pp3–4) cover transitional filing on physical media until an online portal is notified, five-year retention, the authorised officer's affidavit, Commission scrutiny and outside verification, the consequence of incomplete data by reference to the fifth and sixth provisos, periodic review of the guidelines, and case-by-case relaxation.
Annexure-A (pp4–14) lays out each format field by field: F-1 licensee profile; F-2 consumer master list; F-3 fifteen-minute injection, consumption and banking data; F-4 Part A generating-station cost and Parts B and C the SLDC's ramping and MOD data; F-5 power exchange DAM and RTM bids; F-6 BESS contracts and block-wise operation; F-7 the wheeling and transmission losses and charges applied in billing, with the formulae for deriving them from approved charges and published losses. Annexure-B (p14) is the affidavit form. No commencement date or validity period is stated; the notification is dated 16 November 2026 and gazetted 17 November 2026.
Read with this
The regulation
- Dated 20 Feb 2024Green Energy Open Access Regulations, 2024
Amendments and corrections
- Dated 23 Sep 2024Green Energy Open Access (First Amendment) Regulations, 2024
- Dated 28 Mar 2025Green Energy Open Access Regulations, 2024 — Second Amendment, 2025
- Dated 24 Sep 2025Green Energy Open Access Regulations, 2024 — Third Amendment, 2025
- Dated 30 Mar 2026Green Energy Open Access Regulations, 2024 — Fourth Amendment, 2026
- Dated 30 Jun 2026Green Energy Open Access Regulations, 2024 — Fifth Amendment, 2026
- Dated 19 Aug 2026Green Energy Open Access Regulations, 2024 — Sixth Amendment, 2026
- Dated 24 Sep 2026Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Errata
Commencement notices and reasons
- Dated 20 Feb 2024Green Energy Open Access Regulations, 2024 — Statement of Reasons
- Dated 23 Sep 2024Green Energy Open Access Regulations, 2024 — First Amendment — Statement of Reasons
- Dated 28 Mar 2025Green Energy Open Access Regulations, 2024 — Second Amendment, 2025 — Statement of Reasons
- Dated 25 Sep 2025Green Energy Open Access Regulations, 2024 — Third Amendment, 2025 — Statement of Reasons
- Dated 30 Mar 2026Green Energy Open Access Regulations, 2024 — Fourth Amendment, 2026 — Statement of Reasons
- Dated 30 Jun 2026Green Energy Open Access Regulations, 2024 — Fifth Amendment, 2026 — Statement of Reasons
- Dated 19 Aug 2026Green Energy Open Access Regulations, 2024 — Sixth Amendment, 2026 — Statement of Reasons
Earlier drafts
- Dated 23 Jun 2023Green Energy Open Access Regulations, 2023 — Draft
- Dated 31 Aug 2024Green Energy Open Access Regulations, 2024 — First Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Green Energy Open Access (First Amendment) Regulations, 2024 — Explanatory Note — Draft
- Dated 23 Jan 2025Green Energy Open Access Regulations, 2024 — Second Amendment, 2025 — Draft
- Dated 30 Aug 2025Green Energy Open Access Regulations, 2024 — Third Amendment, 2025 — Draft
- Dated 30 Aug 2025Explanatory memorandum: Terms and Conditions for Green Energy Open Access Regulations, 2024 — Third Amendment, 2025 — Explanatory Memorandum — Draft
- Dated 11 Mar 2026Terms & Conditions for Green Energy Open Access (Fourth Amendment) Regulations, 2026 — Draft
- Dated 11 Mar 2026Explanatory memorandum: Green Energy Open Access (Fourth Amendment) Regulations, 2026 — Explanatory Memorandum — Draft
- Dated 6 Jun 2026Green Energy Open Access (Fifth Amendment) Regulations, 2026 — Draft
- Dated 6 Jun 2026Explanatory memorandum: Green Energy Open Access Regulations, 2024 — Fifth Amendment, 2026 — Explanatory Memorandum — Draft
- Dated 20 Jun 2026Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Draft
- Dated 20 Jun 2026File: Consultation Paper — Methodology for Determination of Banking Charges for RE Open Access Consumers under Green Energy Open Access Regulations, 2024
- Dated 20 Jun 2026Explanatory memorandum: Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Explanatory Memorandum — Draft
5 more documents belong here and are not on Voltaic: 5 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.