GERC · Gujarat Electricity Regulatory Commission
Green Energy Open Access Regulations, 2024 — Fourth Amendment, 2026
Gujarat Electricity Regulatory Commission (Terms & Conditions for Green Energy Open Access) (Fourth Amendment) Regulations, 2026
AmendmentDated 30 Mar 2026Published in the Gazette 30 Mar 2026Notification No. 02 of 2026 dated 30/03/2026
Amends the Green Energy Open Access Regulations, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a two-clause amending instrument issued by the Gujarat Electricity Regulatory Commission and published in the Gujarat Government Gazette (Extraordinary, Part IV-C) on 30 March 2026 (p1). It amends the GERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 — called the "Principal Regulations" — and extends to the whole of Gujarat, coming into force on publication in the Official Gazette (p2).
The substance is confined to the banking charge for green energy open access. Clause 2 substitutes Regulation 1(4) of the Principal Regulations so that the banking charge under Regulation 17.6 has a defined validity window, running from notification until 30 June 2026 or an earlier date on which the Commission notifies such charges separately (p2). Clause 3 substitutes Regulation 17.6(viii), restating the banking charge at Rs. 1.50 per unit with the same effective period and providing that charges for the period after the separate notification will be governed by that later regulation (p2).
The amendment is therefore a time-limitation measure: it keeps the existing banking charge alive but expressly sunsets it on 30 June 2026 (or earlier by separate notification), signalling that a fresh banking-charge regulation is contemplated. It is signed by the Secretary, GERC, dated 30/03/2026 (p2). Page 3 carries only dotted filler and no operative text.
Read with this
The regulation
- Dated 20 Feb 2024Green Energy Open Access Regulations, 2024
Amendments and corrections
- Dated 23 Sep 2024Green Energy Open Access (First Amendment) Regulations, 2024
- Dated 28 Mar 2025Green Energy Open Access Regulations, 2024 — Second Amendment, 2025
- Dated 24 Sep 2025Green Energy Open Access Regulations, 2024 — Third Amendment, 2025
- Dated 30 Jun 2026Green Energy Open Access Regulations, 2024 — Fifth Amendment, 2026
- Dated 19 Aug 2026Green Energy Open Access Regulations, 2024 — Sixth Amendment, 2026
- Dated 24 Sep 2026Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Errata
Commencement notices and reasons
- Dated 20 Feb 2024Green Energy Open Access Regulations, 2024 — Statement of Reasons
- Dated 23 Sep 2024Green Energy Open Access Regulations, 2024 — First Amendment — Statement of Reasons
- Dated 28 Mar 2025Green Energy Open Access Regulations, 2024 — Second Amendment, 2025 — Statement of Reasons
- Dated 25 Sep 2025Green Energy Open Access Regulations, 2024 — Third Amendment, 2025 — Statement of Reasons
- Dated 30 Mar 2026Green Energy Open Access Regulations, 2024 — Fourth Amendment, 2026 — Statement of Reasons
- Dated 30 Jun 2026Green Energy Open Access Regulations, 2024 — Fifth Amendment, 2026 — Statement of Reasons
- Dated 19 Aug 2026Green Energy Open Access Regulations, 2024 — Sixth Amendment, 2026 — Statement of Reasons
Procedures and orders made under it
Earlier drafts
- Dated 23 Jun 2023Green Energy Open Access Regulations, 2023 — Draft
- Dated 31 Aug 2024Green Energy Open Access Regulations, 2024 — First Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Green Energy Open Access (First Amendment) Regulations, 2024 — Explanatory Note — Draft
- Dated 23 Jan 2025Green Energy Open Access Regulations, 2024 — Second Amendment, 2025 — Draft
- Dated 30 Aug 2025Green Energy Open Access Regulations, 2024 — Third Amendment, 2025 — Draft
- Dated 30 Aug 2025Explanatory memorandum: Terms and Conditions for Green Energy Open Access Regulations, 2024 — Third Amendment, 2025 — Explanatory Memorandum — Draft
- Dated 11 Mar 2026Terms & Conditions for Green Energy Open Access (Fourth Amendment) Regulations, 2026 — Draft
- Dated 11 Mar 2026Explanatory memorandum: Green Energy Open Access (Fourth Amendment) Regulations, 2026 — Explanatory Memorandum — Draft
- Dated 6 Jun 2026Green Energy Open Access (Fifth Amendment) Regulations, 2026 — Draft
- Dated 6 Jun 2026Explanatory memorandum: Green Energy Open Access Regulations, 2024 — Fifth Amendment, 2026 — Explanatory Memorandum — Draft
- Dated 20 Jun 2026Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Draft
- Dated 20 Jun 2026File: Consultation Paper — Methodology for Determination of Banking Charges for RE Open Access Consumers under Green Energy Open Access Regulations, 2024
- Dated 20 Jun 2026Explanatory memorandum: Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Explanatory Memorandum — Draft
5 more documents belong here and are not on Voltaic: 5 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.