Skip to content

GERC · Gujarat Electricity Regulatory Commission

Green Energy Open Access Regulations, 2024 — Fourth Amendment, 2026

Gujarat Electricity Regulatory Commission (Terms & Conditions for Green Energy Open Access) (Fourth Amendment) Regulations, 2026

AmendmentDated 30 Mar 2026Published in the Gazette 30 Mar 2026Notification No. 02 of 2026 dated 30/03/2026

Amends the Green Energy Open Access Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-clause amending instrument issued by the Gujarat Electricity Regulatory Commission and published in the Gujarat Government Gazette (Extraordinary, Part IV-C) on 30 March 2026 (p1). It amends the GERC (Terms and Conditions for Green Energy Open Access) Regulations, 2024 — called the "Principal Regulations" — and extends to the whole of Gujarat, coming into force on publication in the Official Gazette (p2).

The substance is confined to the banking charge for green energy open access. Clause 2 substitutes Regulation 1(4) of the Principal Regulations so that the banking charge under Regulation 17.6 has a defined validity window, running from notification until 30 June 2026 or an earlier date on which the Commission notifies such charges separately (p2). Clause 3 substitutes Regulation 17.6(viii), restating the banking charge at Rs. 1.50 per unit with the same effective period and providing that charges for the period after the separate notification will be governed by that later regulation (p2).

The amendment is therefore a time-limitation measure: it keeps the existing banking charge alive but expressly sunsets it on 30 June 2026 (or earlier by separate notification), signalling that a fresh banking-charge regulation is contemplated. It is signed by the Secretary, GERC, dated 30/03/2026 (p2). Page 3 carries only dotted filler and no operative text.

Standard name
Green Energy Open Access Regulations
Primary topics
Green energy open access, Energy banking

Read with this

The regulation

Procedures and orders made under it

Earlier drafts

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document