Skip to content

GERC · Gujarat Electricity Regulatory Commission

Green Energy Open Access (Sixth Amendment) Regulations, 2026 — Errata

GUJARAT ELECTRICITY REGULATORY COMMISSION ERRATA TO NOTIFICATION NO. 07 OF 2026

CorrigendumDated 24 Sep 2026Published in the Gazette 24 Sep 2026GERC/2026/08/Tariff/1962 dated 24/09/2026

Corrects the Green Energy Open Access Regulations, 2024 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page errata notification by which the Gujarat Electricity Regulatory Commission corrects the text of the GERC (Terms and Conditions for Green Energy Open Access) (Sixth Amendment) Regulations, 2026, notified as Notification No. 07 of 2026 dated 19 August 2026 and published in the Gujarat Government Gazette Extraordinary (Extra No. 461) of the same date (p1).

Issued as Notification No. 08 of 2026 dated 24 September 2026 and published in the Gazette of that date (p1), it makes eight corrections to Annexure-I of the Sixth Amendment — the green-energy open access banking methodology (p1–2). Every change is terminological: the introductory methodology paragraph, the title of the Step 3 table of formulae, the Scenario 1A and 1B explanations, the sentence after the Scenario 2B explanation, the opening of Step 4, the ANB row of the banking-charges table and the Banking Charges formula are all reworded from 'net revenue' to 'net banking cost' (p1–2).

The Commission states the corrections are clerical, consequential to the defined terms 'Net Banking Cost (S_s)' and 'Aggregate Net Banking Cost (ANB)', and deems them in force from the same date as the Sixth Amendment (p2). The corrected text itself is not reproduced; readers must go to the cited Gazette pages.

Standard name
Green Energy Open Access Regulations
Primary topics
Energy banking, Green energy open access

Read with this

The regulation

Procedures and orders made under it

Earlier drafts

5 more documents belong here and are not on Voltaic: 5 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document