Skip to content

CERC · Central Electricity Regulatory Commission

Sharing of Inter-State Transmission Charges and Losses, 2010 — Third Amendment, 2014 — Draft

Draft Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) (Third Amendment) Regulations, 2014

Draft amendmentDated 7 Feb 2014L-1/44/2010/CERC dated 7th February, 2014

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft amendment notification issued by CERC on 7 February 2014 (p1), proposing the third amendment to the CERC (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010. It is published for previous publication, so the text is a proposal rather than operative law: it would come into force from the date of its publication and its first application period would be Q1 of 2014–15 (p1). It is made under s.178 read with Part V of the Electricity Act, 2003 (p1).

Regulation 2 (p1–4) rewrites definitions in the Principal Regulations — Application Period, Approved Injection, Approved Withdrawal and Designated ISTS Customers — deletes three definitions, and adds rules for reimbursing STUs for non-ISTS lines that carry inter-State power. Regulation 3 (p4–8) is the largest block: it reworks Regulation 7 on network data and forecasts, the Validation Committee, application of the Hybrid method to derive nodal charges and loss factors, peak-scenario computation for each quarterly application period, loss attribution, and the treatment of ISGS connected to STU networks. It also proposes to exempt solar-based generation from ISTS transmission charges and losses for projects commissioned between 1.7.2014 and 30.6.2017 (p8).

Regulation 4 (p8–9) fixes liability where approved injection or withdrawal does not materialise and covers startup and infirm power; Regulation 5 (p9–11) amends billing and the offsetting of PoC charges between long-term, medium-term and short-term open access; Regulation 6 (p11) replaces the list of information the Implementing Agency must publish; and Regulation 7 (p11–13) amends the Annexure, including the substitution of an illustrative zonal-charge computation table. A closing note records the Principal Regulations and the first two amendments (p14).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Open access

Read with this

Other copies of these documents (7)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document