Skip to content

CERC · Central Electricity Regulatory Commission

Sharing of inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2015 — Statement of Reasons

Statement of Reasons – Sharing of inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2015

Statement of reasonsDated 18 Sep 2015

Replaced by Sharing of Inter-State Transmission Charges and Losses Regulations, 2020

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Sharing of Inter State Transmission Charges and Losses Regulations, 2010 or one of its amendments.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken under the repealed regulations shall be deemed to have been done or taken under these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's Statement of Reasons dated 18 September 2015 for the Fourth Amendment to the Sharing of inter-State Transmission Charges and Losses Regulations, 2015 (pp1, 6–7). It explains why CERC proposed to add clauses (w) and (x) to Regulation 7(1) of the 2010 Sharing Regulations so that incremental gas-based generation using e-bid RLNG is exempt from ISTS transmission charges and losses for 2015-16 and 2016-17 (p1). The trigger is the Ministry of Power scheme for utilisation of gas-based generation capacity, OM No.4/2/2015-Th.I dated 27.3.2015, which supplies imported spot e-bid RLNG to stranded gas plants and plants receiving domestic gas and provides transmission-charge/loss exemption and PSDF support (p1). Eligibility under the MoP scheme is tied to plants whose average PLF during April–January 2014-15 was below target (p1).

Paras 3–3.3 record stakeholder comments (pp2–3). GRIDCO objects that gas plants are concentrated in a few states, that non-beneficiary states would cross-subsidise them, and that there is no RPO-type obligation for gas; it suggests the CTU bear the cost. POWERGRID asks that waived and billed transmission charges be shown separately and that the exemption be socialised nationally in PoC. LANCO seeks inclusion of swapped gas in lieu of e-bid RLNG and reimbursement of charges paid before final notification.

The Commission's decision (paras 4–6, pp3–7) accepts the solar-power analogy, treats the waiver as a collective policy sacrifice, and limits it to incremental e-bid RLNG generation above base PLF and up to target PLF as defined by the Empowered Pool Management Committee (pp4–5). It sets out a scheduling and billing procedure for four generator/transaction categories, with monthly reporting by RLDCs and RPCs and recovery/disbursement by CTU (pp5–6). LANCO's gas-swapping plea is rejected as outside the amendment's scope, but retrospective effect from 1.6.2015 is allowed to align with the MoP scheme (p6). The final modified clauses (w) and (x) are set out at pp6–7.

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Open access

Read with this

Other copies of these documents (7)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.