CERC · Central Electricity Regulatory Commission
Sharing of inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2015 — Statement of Reasons
Statement of Reasons – Sharing of inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2015
Statement of reasonsDated 18 Sep 2015
Replaced by Sharing of Inter-State Transmission Charges and Losses Regulations, 2020
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Sharing of Inter State Transmission Charges and Losses Regulations, 2010 or one of its amendments.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken under the repealed regulations shall be deemed to have been done or taken under these regulations.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's Statement of Reasons dated 18 September 2015 for the Fourth Amendment to the Sharing of inter-State Transmission Charges and Losses Regulations, 2015 (pp1, 6–7). It explains why CERC proposed to add clauses (w) and (x) to Regulation 7(1) of the 2010 Sharing Regulations so that incremental gas-based generation using e-bid RLNG is exempt from ISTS transmission charges and losses for 2015-16 and 2016-17 (p1). The trigger is the Ministry of Power scheme for utilisation of gas-based generation capacity, OM No.4/2/2015-Th.I dated 27.3.2015, which supplies imported spot e-bid RLNG to stranded gas plants and plants receiving domestic gas and provides transmission-charge/loss exemption and PSDF support (p1). Eligibility under the MoP scheme is tied to plants whose average PLF during April–January 2014-15 was below target (p1).
Paras 3–3.3 record stakeholder comments (pp2–3). GRIDCO objects that gas plants are concentrated in a few states, that non-beneficiary states would cross-subsidise them, and that there is no RPO-type obligation for gas; it suggests the CTU bear the cost. POWERGRID asks that waived and billed transmission charges be shown separately and that the exemption be socialised nationally in PoC. LANCO seeks inclusion of swapped gas in lieu of e-bid RLNG and reimbursement of charges paid before final notification.
The Commission's decision (paras 4–6, pp3–7) accepts the solar-power analogy, treats the waiver as a collective policy sacrifice, and limits it to incremental e-bid RLNG generation above base PLF and up to target PLF as defined by the Empowered Pool Management Committee (pp4–5). It sets out a scheduling and billing procedure for four generator/transaction categories, with monthly reporting by RLDCs and RPCs and recovery/disbursement by CTU (pp5–6). LANCO's gas-swapping plea is rejected as outside the amendment's scope, but retrospective effect from 1.6.2015 is allowed to align with the MoP scheme (p6). The final modified clauses (w) and (x) are set out at pp6–7.
Read with this
The regulation
Amendments and corrections
- Dated 24 Nov 2011Sharing of inter-State Transmission Charges and Losses, 2010 — First Amendment, 2011
- Dated 28 Mar 2012Sharing of inter-State Transmission Charges and Losses (Second Amendment) Regulations, 2012
- Dated 1 Apr 2015Sharing of Inter-State Transmission Charges and Losses Regulations, 2010 — Third Amendment, 2015
- Dated 1 Apr 2015Sharing of Inter-State Transmission Charges and Losses Regulations, 2010 — Third Amendment, 2015
- Dated 3 Jul 2015Sharing of inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2015
- Dated 14 Dec 2017Sharing of Inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2017
- Dated 27 Mar 2019Sharing of inter-State Transmission Charges and Losses Regulations, 2010 — Sixth Amendment, 2019
Commencement notices and reasons
- Dated 11 Jun 2010Sharing of Inter State Transmission Charges and Losses Regulations, 2010 — Statement of Reasons
- Dated 21 Nov 2011Sharing of inter-State Transmission Charges and Losses Regulations, 2010 — First Amendment, 2011 — Statement of Reasons
- Dated 2 May 2012Sharing of inter-State Transmission Charges and Losses Regulations, 2010 — Second Amendment, 2012 — Statement of Reasons
- Dated 26 Oct 2015Sharing of Inter-State Transmission Charges and Losses (Third Amendment) Regulations, 2015 — Statement of Reasons
- Dated 15 Dec 2017Sharing of Inter-State Transmission Charges and Losses Regulations, 2010 — 5th Amendment, 2017 — Statement of Reasons
- Dated 23 Apr 2019Sharing of inter-State Transmission Charges and Losses Regulations, 2010 — Sixth Amendment, 2018 — Statement of Reasons
- Date not statedComments on Draft Amendment to Sharing of Inter-State Transmission Charges and Losses (Third Amendment) Regulations, 2014
- Date not statedAppendix-II — Stakeholder comments on draft Third Amendment to the Sharing of Inter-State Transmission Charges and Losses Regulations, 2014
Procedures and orders made under it
Other copies of these documents (7)
- Dated 30 Dec 2010Sharing of Inter-State Transmission Charges and Losses Regulations, 2010 — Commencement Notification
- Dated 30 Dec 2010Sharing of Inter-State Transmission Charges and Losses Regulations, 2010 — Commencement Notification
- Dated 24 Nov 2011Sharing of Inter-State Transmission Charges and Losses Regulations, 2010 — First Amendment, 2011
- Dated 28 Mar 2012Sharing of Inter-State Transmission Charges and Losses (Second Amendment) Regulations, 2012
- Dated 3 Jul 2015Sharing of inter-State Transmission Charges and Losses Regulations, 2010 — Fourth Amendment, 2015
- Dated 14 Dec 2017Sharing of Inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2017
- Dated 27 Mar 2019Sharing of inter-State Transmission Charges and Losses (Sixth Amendment) Regulations, 2019
Earlier drafts
- Dated 7 Feb 2014Sharing of Inter-State Transmission Charges and Losses, 2010 — Third Amendment, 2014 — Draft
- Released with the notice dated 7 Feb 2014Explanatory memorandum: Sharing of inter-State Transmission Charges and Losses Regulations, 2010 — Third Amendment — Explanatory Memorandum
- Dated 7 Feb 2014Public notice: Draft Sharing of inter-State Transmission Charges and Losses (Third Amendment) Regulations, 2014 — Public Notice
- Dated 24 Feb 2014Notice extending the date for comments: Public Notice — Extension of time for comments on draft Sharing of Inter-state Transmission Charges and Losses (Third Amendment) Regulations, 2014
- Dated 27 May 2015Sharing of inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2015 — Draft
- Released with the notice dated 27 May 2015Explanatory memorandum: Explanatory Memorandum — Draft Sharing of inter-State Transmission Charges and Losses (Fourth Amendment) and Power System Development Fund (First Amendment) Regulations, 2015
- Dated 27 May 2015Public notice: Public Notice — Draft Sharing of inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2015 and Draft Power System Development Fund (First Amendment) Regulations, 2015
- Dated 28 Oct 2016Sharing of Inter-State Transmission Charges and Losses Regulations, 2010 — Fifth Amendment, 2016 — Draft
- Released with the draft dated 28 Oct 2016Explanatory memorandum: Explanatory Memorandum to draft Connectivity, LTA and MTOA (Sixth Amendment) Regulations, 2015 and Sharing of Inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2016 — Draft
- Dated 16 Nov 2016Notice extending the date for comments: Public Notice — Extension of comment deadline on draft Connectivity, LTA and MTOA (Sixth Amendment) and Sharing of Inter-State Transmission Charges & Losses (Fifth Amendment) Regulations, 2016
- Dated 27 Apr 2018Sharing of Inter State Transmission Charges and Losses Regulations, 2010 — Sixth Amendment, 2018 — Draft
- Dated 27 Apr 2018Public notice: Sharing of Inter-State Transmission Charges and Losses Regulations, 2010 — Sixth Amendment, 2018 — Draft — Public Notice
- Released with the notice dated 27 Apr 2018Explanatory memorandum: Sharing of Inter State Transmission Charges and Losses Regulations, 2010 — Sixth Amendment — Explanatory Memorandum — Draft
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.