Skip to content

CERC · Central Electricity Regulatory Commission

Appendix-II — Stakeholder comments on draft Third Amendment to the Sharing of Inter-State Transmission Charges and Losses Regulations, 2014

Comments/suggestions on Draft Amendment to Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) (Third Amendment) Regulations, 2014 during Public Hearing on 12.6.2014

RegulationDate not stated

Replaced by Sharing of Inter-State Transmission Charges and Losses Regulations, 2020

See that regulation for the date it took effect and for anything it keeps in force.

Read with the Sharing of Inter State Transmission Charges and Losses Regulations, 2010.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken under the repealed regulations shall be deemed to have been done or taken under these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is Appendix-II to CERC's consultation record on the draft Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) (Third Amendment) Regulations, 2014. It compiles the comments stakeholders submitted for the public hearing held on 12.6.2014, arranged clause-by-clause against the draft amendments and cross-referenced to the Statement of Reasons (SoR) of the draft. Page 1 lists the nine commenters: Adani Power, CTU, GRIDCO, Himachal Small Hydro Power Association, NTPC, POSOCO, S. A. Soman and Somasekara Rao Manda, TPCIL and Torrent Power.

Section 1 covers the proposed changes to the definitions in Regulation 2 (pp2–6) and is dominated by the central proposal to levy transmission charges on peak injection/withdrawal rather than on open access availed or average usage. TPCIL and Torrent Power support it; POSOCO opposes, arguing Generation Network Access (GNA) should be implemented first and that DIC-submitted data is prone to gaming (pp2–4). Section 3, on the computation of point-of-connection (PoC) charges under Regulation 7 (pp6–13), draws the most comment: dispensing with the uniform charge and slab systems, truncating the network at 400 kV, average versus peak generation data, a uniform 'reliability charge' floor, ISGS connected to both STU and ISTS networks (with cited Commission judgments), and loss allocation. S. A. Soman and Rao Manda propose a min-max fair marginal participation method with a case study (pp8–9).

Sections 4 and 5 (pp13–22) address Regulation 8 — liability for transmission charges when generation commissioning is delayed, force majeure, IDC and start-up/infirm power — and Regulation 11 — set-off of STOA and MTOA charges against LTA charges, and the 2% rebate. Section 6 concerns transparency of the Webnet computation tool under Regulation 17 (p22); Section 7 the Annexure and the truncation/HVDC question (pp23–24); Section 8 additional requests from Himachal Small Hydro on preferential tariff, REC multiplier and APPC definition, and from GRIDCO (p23). The closing item is POWERGRID's proposal for a payment security condition barring short-term open access to defaulters (p24).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Losses and loss reduction, Open access

Read with this

Other copies of these documents (7)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document