Sharing of Inter-State Transmission Charges and Losses Regulations, 2010 — Fifth Amendment, 2016 — Draft

Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) (Fifth Amendment) Regulations, 2016

Draft amendmentDated 28 Oct 2016No.L-1/44/2010-CERC dated 28th October, 2016

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the draft of the Fifth Amendment to the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2010, issued for previous publication and dated 28 October 2016 (p1). It is short — five operative regulations — but it touches the charging architecture rather than tinkering: the Commission proposes where transmission charges fall when a customer holds connectivity but no long- or medium-term access, and it proposes a wind-specific waiver. It takes effect from Gazette publication, and no Gazette date is printed (p1).

Regulation 2 amends Regulation 7 of the Principal Regulations. It makes a Reliability Support Charge payable by a Designated ISTS Customer on the quantum of connectivity granted by CTU from the date of physical connection, even where no LTA or MTOA is availed, capped at the connectivity quantum, billed in phases if connectivity is phased, and with any STOA payment set off against the connectivity quantum (p1–2). It also inserts a new sub-clause waiving transmission charges and losses for wind-based generation awarded through competitive bidding and commissioned till 31.3.2019, for 25 years from commissioning, conditional on PPAs with distribution companies for RPO compliance (p2).

Regulation 3 substitutes a proviso in Regulation 8 so that charges for start-up power and pre-LTA infirm power are payable and then reimbursed to DICs in the following month, and adds a fallback that generators with LTA to a target region whose POC rate is undetermined for the quarter are billed at the target region's average POC rate (p2).

Regulation 4 substitutes Regulation 9(l) — prescribing multipliers on LTA POC rates for MTOA customers and on normal STOA POC rates for STOA customers not availing LTA to the target region, with surplus reimbursed to DICs — and modifies Regulation 11 on adjustment of MTOA/STOA quantum against LTA, the third part of the monthly bill for FERV, incentive and commissioning variations, and the billing calendar (p3–4).

Regulation 5 amends the Annexure to rebase Reliability Support Charges as a proportion of monthly transmission charges and to specify how that rate is multiplied for each customer class (p5). The closing Note lists the Principal Regulations and the earlier amendments (p5).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Open access charges, Open access

Read with this

Other copies of these documents (7)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document