Skip to content

CERC · Central Electricity Regulatory Commission

Comments on Draft Amendment to Sharing of Inter-State Transmission Charges and Losses (Third Amendment) Regulations, 2014

Comments/suggestions on Draft Amendment to Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) (Third Amendment) Regulations, 2014

RegulationDate not stated

Replaced by Sharing of Inter-State Transmission Charges and Losses Regulations, 2020

See that regulation for the date it took effect and for anything it keeps in force.

Read with the Sharing of Inter State Transmission Charges and Losses Regulations, 2010.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken under the repealed regulations shall be deemed to have been done or taken under these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 29 of 110. Check the regulator's original before you rely on it.

This is Appendix-I of the consultation package for the draft CERC (Sharing of Inter State Transmission Charges and Losses) (Third Amendment) Regulations, 2014. It is not the draft amendment or the final regulation; it collects stakeholder comments and suggested drafting on the proposed changes, beginning with a list of 27 commenting companies, associations and individuals (p1).

Part 1 covers proposed changes to Regulation 2 definitions (pp2–18): application period and quarterly computation, approved injection and approved withdrawal, the revised DIC definition and STU collection role, removal of uniform charges, yearly transmission charges for non-ISTS lines, and treatment of intra-state entities using ISTS. Stakeholders offer alternatives — for example, six two-month blocks instead of four quarters (pp2–3), LTA/MTOA-based approved quantums (pp3, 9), and retention of the existing DIC definition (pp10–12). A sample normalization table is reproduced at pp4 and 8.

Part 2 records no comments on Regulation 3(b) (p18). Part 3 covers Regulation 7 (pp18–29): use of peak versus average load flow for PoC rates, validation of the basic network, continued truncation at 400 kV, removal of slab rates, definition of peak hours, and the treatment of ISGS connected to both STU and ISTS. Comments also oppose changing loss allocation based on the scheduling agency and ask for continued zonal PoC loss allocation (pp26–28). The final pages seek extension of ISTS charge/loss exemptions to wind, small hydro and large hydro (p29). No Commission decisions, rates, or commencement dates are set in the supplied pages.

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Losses and loss reduction, Payment security

Read with this

Other copies of these documents (7)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.