Sharing of Inter-State Transmission Charges and Losses Regulations, 2010 — Third Amendment, 2015

Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) (Third Amendment) Regulations, 2015

AmendmentDated 1 Apr 2015In force from 1 May 2015No.L-1/44/2010-CERC dated 1st of April, 2015

Replaced by Sharing of Inter-State Transmission Charges and Losses Regulations, 2020

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Sharing of Inter State Transmission Charges and Losses Regulations, 2010.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken under the repealed regulations shall be deemed to have been done or taken under these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the CERC's Third Amendment to its 2010 regulations on sharing inter-State transmission charges and losses, notified on 1 April 2015 and brought into force on 1 May 2015 (p1). It is a substantial rewrite of definitions, charge-computation mechanics and billing, not a marginal correction.

Regulation 2 redefines the building blocks of the Point of Connection (PoC) system: Application Period, Approved Injection, Approved Withdrawal, Approved Additional Medium Term Withdrawal, Designated ISTS Customer, and new terms HVDC Charge, Merchant Power Plant, Reliability Support Charge and its sharing methodology, and Validation Committee; some existing sub-clauses are deleted (p1–4). Regulation 3 widens the applicability clause for generating stations, and Regulation 5(4) changes the unit in which charges are expressed (p4).

Regulation 7 is the core (p4–8): submission and vetting of forecast generation and demand data by DICs, validation by the Validation Committee against three years of historical data, a mis-declaration tolerance treated as gaming, preparation and convergence of the Basic Network load flow, slab-based PoC rates, application of the Hybrid Methodology, recovery of Yearly Transmission Charges through PoC, Reliability Support and HVDC charges, loss apportionment, and special treatment of 400 kV inter-State generators and merchant plants.

Regulation 8 makes a DIC liable for allocated charges when its approved injection or withdrawal does not materialise, including on LTA delay and part-commissioned transmission (p8–9). Regulation 11 prescribes a three-part bill — PoC, Reliability Support and HVDC charges; then additional MTOA; then over/under-recovery adjustment — with offset rules for MTOA and STOA (p10–13). Regulations 16 and 17 reset data-submission timelines and the Implementing Agency's publication duties (p13–14). Annexure-I amendments supply the detailed methodology for nodal data, load flow, HVDC cost sharing, slab computation, Reliability Support Charge rates and worked billing examples (p14–21). The closing Note records the Gazette publication dates of the principal regulations and the first two amendments (p21).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Losses and loss reduction, Open access

Read with this

Other copies of these documents (7)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.