Sharing of inter-State Transmission Charges and Losses, 2010 — First Amendment, 2011

Central Electricity Regulatory Commission (Sharing of inter-State Transmission Charges and Losses)(First Amendment) Regulations, 2011

AmendmentDated 24 Nov 2011No.L-1/44/2010-CERC dated the 24st November, 2011

Replaced by Sharing of Inter-State Transmission Charges and Losses Regulations, 2020

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Sharing of Inter State Transmission Charges and Losses Regulations, 2010.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken under the repealed regulations shall be deemed to have been done or taken under these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the first amendment to the CERC (Sharing of inter-State Transmission Charges and Losses) Regulations, 2010 — the PoC-based regime for sharing ISTS charges and losses — issued as Notification No. L-1/44/2010-CERC dated 24 November 2011 and made under section 178 of the Electricity Act, 2003. It comes into force from the date of publication in the Official Gazette; that Gazette date is not printed here (p1). The closing Note records that the Principal Regulations were gazetted on 16 June 2010 (p8).

Regulation 2 rewrites the core definitions in Regulation 2 of the Principal Regulations: 'Approved Injection' and 'Approved Withdrawal' (p1–2), a new term 'Target Region' for a region to which a generator sells after obtaining Long-term Access where beneficiaries are not identified (p2), and a recast 'Yearly Transmission Charge (YTC)' tied to section 62/63 determination or adoption by the Appropriate Commission (p3). It also adds provisos allowing distribution companies or a State-designated agency to be treated as the Designated ISTS Customer, both for billing that pre-dates the Principal Regulations and after their implementation (p2). Regulation 3 redefines the STU/SEB category of Designated ISTS Customers (p3).

Regulation 4 amends Regulation 7: how YTC is apportioned across voltage levels and conductor configurations using CTU indicative cost levels, a revision cycle for YTC, deletion of sub-clause (m), and a proviso permitting a single CEA-based scenario for PoC determination for 2011-12 (p3–4). Regulation 5 rewrites the billing mechanics in Regulation 11 — the first and second parts of the bill, target-region charges without identified beneficiaries, Medium-term and Short-term Open Access offsets against Long-term Access, the deviation bill and its reimbursement, and deletion of clause (8) (p4–7). Regulation 6 amends the Annexure's network-data clause on RPC-certified non-ISTS lines, the 15.06.2010 cut-off, the load-flow test for new certification, and the treatment of three named HVDC inter-regional links (p7–8).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Open access

Read with this

Other copies of these documents (7)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document