Sharing of Inter-State Transmission Charges and Losses (Third Amendment) Regulations, 2015 — Statement of Reasons

Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) (Third Amendment) Regulations, 2015 — Statement of Reasons

Statement of reasonsDated 26 Oct 2015File No. L-1/44/2010/CERC dated 26th October 2015

Replaced by Sharing of Inter-State Transmission Charges and Losses Regulations, 2020

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Sharing of Inter State Transmission Charges and Losses Regulations, 2010 or one of its amendments.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken under the repealed regulations shall be deemed to have been done or taken under these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 29 of 147. Check the regulator's original before you rely on it.

This is CERC's Statement of Reasons for the Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) (Third Amendment) Regulations, 2015, issued 26 October 2015 under File No. L-1/44/2010/CERC (p1). It explains why the Commission rewrote key definitions and the charge-sharing methodology of the 2010 Sharing Regulations and records its decisions on stakeholder objections (p1–6).

The opening pages set out the statutory and policy mandate — Electricity Act s.61, the 2005 National Electricity Policy and the 2006 Tariff Policy — and summarise the Third Amendment's broad features: charging commensurate with maximum actual usage, a new reliability support charge, separate treatment of HVDC assets, and nine slab rates replacing three (p2–5). The Commission also explains why slab/PoC rates differ before and after the amendment (p5).

Section 2 onward works clause by clause. Regulation 2(1)(b) is amended to define the application period as three-month quarters with a proviso allowing extension or curtailment (p6–7). Regulation 2(1)(c) and (f) redefine Approved Injection and Approved Withdrawal around maximum injection/withdrawal over the last three corresponding application periods, validated by the Validation Committee, while billing is done on LTA/MTOA (p7–16). Related definitions are changed or added: Approved Additional Medium Term Withdrawal, Designated ISTS Customer, HVDC Charge, Merchant Power Plant, Reliability Support Charge and its sharing methodology, and Validation Committee, while Uniform Charge definitions are deleted (p16–19).

The longest discussion concerns removal of the uniform charge. The Commission reviews beneficiary-pays reasoning and foreign practice, rejects retrospective deletion from 1.7.2011 as both legally and commercially impossible, and confirms the Third Amendment took effect from 1.5.2015 (p19–23). It then argues, with extensive extracts from FERC/Order No. 1000, MIT and CERTS material, that all grid-connected users benefit from reliability, justifying the new reliability support charge (p23–29).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Open access, Losses and loss reduction

Read with this

Other copies of these documents (7)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document