Sharing of inter-State Transmission Charges and Losses Regulations, 2010 — Sixth Amendment, 2018 — Statement of Reasons

Central Electricity Regulatory Commission (Sharing of inter-State Transmission Charges and Losses) Regulations (6 th Amendment), 2018

Statement of reasonsDated 23 Apr 2019L-1/44/2010-CERC dated 23rd April 2019

Replaced by Sharing of Inter-State Transmission Charges and Losses Regulations, 2020

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Sharing of Inter State Transmission Charges and Losses Regulations, 2010 or one of its amendments.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken under the repealed regulations shall be deemed to have been done or taken under these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's Statement of Reasons dated 23 April 2019 for finalizing the Sixth Amendment to the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2010 (pp1, 15). It explains why the Commission adopted the draft amendment notified on 27.4.2018 after public consultation.

The opening section records the draft notification, the eight stakeholders who commented, and the consultation process (pp1–2). Section 2 is the substance: waiver of ISTS charges and losses for wind and solar projects. It reproduces Tariff Policy 2016 para 6.4(6), Ministry of Power orders dated 30.9.2016, 14.6.2017 and 13.2.2018, and the existing Fifth Amendment (pp2–5). It then summarizes stakeholder objections: whether "competitive bidding" means energy procurement or equipment procurement; whether the waiver should extend to captive/open-access and Section 62 projects; whether eligibility should attach to bidding before 31.3.2022 rather than commissioning; STU connectivity; and the socialized cost burden on DISCOMs and RE-rich states (pp5–9).

In its analysis (pp9–15), the Commission clarifies that competitive bidding follows Central Government guidelines; declines to take a view on the thermal flexibility scheme absent a notification under the Tariff Policy; treats the STU-as-ISTS and bidding-date suggestions as beyond scope; refers MSEDCL's PSDF funding request to the Government; and relies on MNRE and MoP letters to finalize the waiver. It makes the amended Regulation effective from the date of the MoP order, 13.2.2018, while the final amendment text substitutes "12.2.2018" in Regulation 7(1)(y) and (z) (pp14–15).

The operative amendment in para 2.7 adds Regulation 7(1)(aa) granting no ISTS charges/losses for solar and wind generation for 25 years from commercial operation, subject to competitive bidding, COD between 13.2.2018 and 31.3.2022, and PPAs with all entities including DISCOMs for RPO compliance (p15). Appendix-I lists the commenters (p16).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Renewable purchase obligation (RPO / RCO), Competitive bidding

Read with this

Other copies of these documents (7)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document