CERC · Central Electricity Regulatory Commission

Explanatory Memorandum to draft Connectivity, LTA and MTOA (Sixth Amendment) Regulations, 2015 and Sharing of Inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2016 — Draft

Explanatory Memorandum to draft Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Sixth Amendment) Regulations, 2015 and draft Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) Regulations, Fifth Amendment 2016.

Explanatory memorandum to a draftReleased with the draft dated 28 Oct 2016

Explanatory memorandum to the Grant of Connectivity, Long-term Access and Medium-term Open Access (Sixth Amendment) Regulations, 2016 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's explanatory memorandum setting out the reasoning for two packages of draft amendments and inviting comments from stakeholders. Part A (p1-2) gives the market background: falling short-term prices, rising short-term volumes, generators relinquishing long-term access while still evacuating power under short-term and medium-term open access, and CTU's warning that transmission planning, which is driven by long-term access, will under-build capacity and cause congestion.

Part B (p2-16) proposes amendments to the 2009 Connectivity, Long-term Access and Medium-term Open Access Regulations. It would shorten the minimum long-term access period to align with the definition of long-term procurement in the 2005 bidding guidelines; insert a clause obliging an LTA customer with a target region to notify its PPA, with scheduling, last-mile link timelines, a one-month processing deadline on CTU and curtailment of MTOA/STOA on that corridor; revise the MTOA definition and the window for its start date; drop 'transmission system under execution' from the test for granting MTOA while leaving existing grants undisturbed; replace the dedicated transmission line regulation so the generator develops, owns and operates the line to the pooling station, with a cap on its length and charging rules for lines already built by CTU; add a provision on underutilisation of LTA/MTOA; and insert power to relax and power to remove difficulties.

Part C (p16-30) proposes amendments to the Sharing of Inter-State Transmission Charges and Losses Regulations: a reliability support charge on connectivity quantum not covered by LTA/MTOA; higher transmission charges for MTOA and STOA customers who have not sought LTA, with the surplus refunded to DICs; adoption of the MoP waiver of ISTS charges and losses for wind projects awarded by competitive bidding and commissioned by the stated cut-off, with no change proposed for solar; moving the third part of the transmission bill onto a quarterly cycle; clarifying the offset given to LTA customers who also pay MTOA/STOA charges; and a rule for billing generators at the target-region average PoC rate where their rate has not been notified.

Standard name
Connectivity and GNA Regulations, Sharing of Inter-State Transmission Charges and Losses
Primary topics
Open access, Connectivity and GNA, Open access charges

Read with this

Read with this: Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations, 2009

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

It is also read with: Sharing of Inter State Transmission Charges and Losses Regulations, 2010

Draft · Explanatory memorandum to the Sharing of Inter-State Transmission Charges and Losses Regulations, 2010 — Fifth Amendment, 2016 — Draft. The draft has since been finalised as the Sharing of Inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2017.

Other copies of these documents (7)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗