CERC · Central Electricity Regulatory Commission

Sharing of inter-State Transmission Charges and Losses (Fourth Amendment) Regulations, 2015 — Draft

Central Electricity Regulatory Commission (Sharing of inter-State Transmission Charges and Losses) (Fourth Amendment) Regulations, 2015

Draft amendmentDated 27 May 2015L-1/44/2010/CERC dated 27 th May, 2015

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page set of CERC draft amendment notifications, both dated 27 May 2015 and both stated to come into force on 1 June 2015 (p1, p2). Each is a short, single-clause amendment published for previous publication; neither page sets out a consultation timeline or comment process.

The first, No. L-1/44/2010/CERC (p1), proposes the Fourth Amendment to the CERC (Sharing of inter-State Transmission Charges and Losses) Regulations, 2010. It inserts two sub-clauses into Regulation 7(1) so that no transmission charges and no transmission losses for use of the inter-State transmission system are payable for the portion attributed to incremental gas-based generation from e-bid RLNG. The relief is tied to the years 2015-16 and 2016-17 and is expressly calibrated to the scheme sanctioned by the Ministry of Power by Office Memorandum No. 4/2/2015.Th.1 dated 27.3.2015 (p1). A closing note recites the Gazette publication history of the principal 2010 regulations and of its first three amendments.

The second, No. L-1/148/2014/CERC (p2), proposes the First Amendment to the CERC (Power System Development Fund) Regulations, 2014, adding a new clause (3A) after clause (3) of Regulation 4. Opening with a non-obstante phrase, it makes any Central Government scheme for the development of the power system that requires PSDF support as part of the scheme eligible for PSDF assistance. Its note records only the Gazette publication of the principal PSDF regulations (p2).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Power System Development Fund (PSDF)

Read with this

Other copies of these documents (7)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document