CERC · Central Electricity Regulatory Commission

Sharing of inter-State Transmission Charges and Losses (Second Amendment) Regulations, 2012

Central Electricity Regulatory Commission (Sharing of inter-State Transmission Charges and Losses) (Second Amendment) Regulations, 2012

AmendmentDated 28 Mar 2012No.–L-1/44/2010-CERC dated 28th March 2012

Replaced by Sharing of Inter-State Transmission Charges and Losses Regulations, 2020

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Sharing of Inter State Transmission Charges and Losses Regulations, 2010.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken under the repealed regulations shall be deemed to have been done or taken under these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the second amendment to CERC's 2010 Sharing of inter-State Transmission Charges and Losses Regulations, issued 28 March 2012 and effective from the Gazette publication date (p1). It rewrites the computational definitions that drive the point-of-connection (PoC) sharing mechanism and reshapes how zones, slabs and timelines work.

Paragraph 2 amends the definitions in Regulation 2: new provisos to the 'approved injection' and 'approved withdrawal' clauses bar use of a generating unit's overload capability and instead pin the figures to LTA or, absent LTA, installed capacity net of auxiliary consumption (p1–2); the definitions of 'Implementing Agency' and 'Yearly Transmission Charge' are substituted, the latter widened to cover deemed ISTS licensees, owners of inter-State lines and non-ISTS lines certified by RPCs (p2).

Paragraph 3 is the substantive core. The YTC data-submission deadline in Regulation 7(1)(i) is re-anchored to three months before YTC revision rather than 15 December (p2). New provisos introduce three slab rates for injection and demand PoC charges up to 2013-14 with rationalisation in 2014-15 on Commission review, tie load-flow studies to each YTC revision, and introduce slabs for transmission losses for 2011-12 (p3). Zoning rules in Regulation 7(1)(t) are rewritten: zones are built from geographically and electrically contiguous nodes, demand zones follow State boundaries, 400 kV inter-State generating stations are separate zones with a merchant-plant carve-out, and para (v) is deleted (p3–4). 'Charges' becomes 'rates' in several clauses, and 'Annexure-I' becomes 'Annexure' (p4).

Paragraph 4 resets RPC reporting timelines for Regional Transmission Accounts and Regional Transmission Deviation Accounts (p4). Paragraph 5 changes the wording of the Regulation 11 computation formulae (p5). Paragraph 6 amends the Annexure: a new heading carves out Yearly Transmission Charges from the Switch Shunt Data section; Talcher–Kolar HVDC cost allocation to Southern Region DICs is restated with a proviso for national synchronous connection; loss slabs are added for the NEW and SR grids; and the illustrative table under para 2.8.1 is updated (p5–6).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Losses and loss reduction

Read with this

Other copies of these documents (7)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.