Skip to content

CERC · Central Electricity Regulatory Commission

Sharing of inter-State Transmission Charges and Losses (Sixth Amendment) Regulations, 2019

Central Electricity Regulatory Commission (Sharing of inter-State Transmission Charges and Losses) (Sixth Amendment), Regulations, 2019

Amendment · Gazette copyDated 27 Mar 2019Published in the Gazette 27 Mar 2019In force from 13 Feb 2018No. L-1/44/2010-CERC.— dated 27th March, 2019

Replaced by Sharing of Inter-State Transmission Charges and Losses Regulations, 2020

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Sharing of inter-State Transmission Charges and Losses Regulations, 2010 — Sixth Amendment, 2019.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken under the repealed regulations shall be deemed to have been done or taken under these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Sixth Amendment to CERC's Sharing of inter-State Transmission Charges and Losses Regulations, 2010 was issued by notification dated 27 March 2019 and published in the Gazette of India, Extraordinary, Part III, Section 4 (p1–2). It has two operative limbs.

Regulation 1 gives the short title and states that the amendment comes into effect from 13.2.2018 — a retrospective commencement roughly thirteen months before publication (p2).

Regulation 2 amends Regulation 7(1) of the Principal Regulations three ways: it substitutes the date appearing in sub-clauses (y) and (z), and inserts a new sub-clause (aa) (p2–3). The new sub-clause waives transmission charges and losses for use of the ISTS network for solar- and wind-based generation for 25 years from the date of commercial operation, subject to three cumulative conditions: the capacity must have been awarded through competitive bidding under Central Government guidelines; it must have been declared under commercial operation between 13.2.2018 and 31.3.2022; and power purchase agreements must have been executed for sale of that capacity to all entities, including distribution companies, for compliance of their renewable purchase obligations (p3).

Page 3 closes with the Secretary's signature and a Note tracing the Principal Regulations' lineage — the original notification of 16.6.2010 and the First through Fifth Amendments — with gazette references and dates (p3). That Note lists two entries both styled 'Third Amendment Regulations, 2015' and repeats gazette No. 239 dated 8.7.2015, which reads as a typographical slip in the source (p3).

Page 1 is the Hindi version of the same notification, set in a legacy Devanagari font that renders as unreadable Latin transliteration in this file; only the English pages 2–3 are usable.

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Competitive bidding

Read with this

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document