CERC · Central Electricity Regulatory Commission

Sharing of Inter-State Transmission Charges and Losses Regulations, 2010 — Third Amendment, 2015

Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) (Third Amendment) Regulations, 20 IS

AmendmentDated 1 Apr 2015Published in the Gazette 7 Apr 2015No.L-l/44/2010-CERC

Replaced by Sharing of Inter-State Transmission Charges and Losses Regulations, 2020

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Sharing of Inter State Transmission Charges and Losses Regulations, 2010.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken under the repealed regulations shall be deemed to have been done or taken under these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 24 of 25. Check the regulator's original before you rely on it.

This is CERC's Third Amendment to the 2010 Sharing of Inter-State Transmission Charges and Losses Regulations, notified on 1 April 2015 and in force from 1 May 2015 (pp12–13). It rewrites definitions, charging mechanics and Annexure-I methodology for the point-of-connection (PoC) regime. The English operative text starts at p12.

Regulations 2–4 recast key definitions — application period, approved injection/withdrawal, DIC, HVDC charge, merchant power plant, reliability support charge and validation committee — and adjust the generating stations covered and units of charge (pp13–14). Regulation 5 reworks Regulation 7: forecast data, validation, load-flow base case, loss allocation, charge and loss slabs, reliability support recovery, HVDC cost sharing and separate zoning of 400 kV-connected ISGS (pp14–16). Regulation 6 makes DICs liable where approved withdrawal/injection does not materialise and addresses start-up/infirm power (p17). Regulation 8 recasts billing under Regulation 11 into a PoC/reliability/HVDC first part and an MTOA second part, with adjustment rules (pp18–20). Regulations 9–10 move data timelines to the application period and expand publication duties (pp20–21). Regulation 11 replaces much of Annexure-I: nodal generation/demand vetting, load flow, HVDC treatment, PoC and slab-rate methodologies, with a worked zonal example at p24.

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Losses and loss reduction, Open access

Read with this

Other copies of these documents (7)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.