Sharing of inter-State Transmission Charges and Losses Regulations, 2010 — Sixth Amendment, 2019

Central Electricity Regulatory Commission (Sharing of inter-State Transmission Charges and Losses) (Sixth Amendment), Regulations, 2019

AmendmentDated 27 Mar 2019In force from 13 Feb 2018No. L-1/44/2010-CERC dated 27

Replaced by Sharing of Inter-State Transmission Charges and Losses Regulations, 2020

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Sharing of Inter State Transmission Charges and Losses Regulations, 2010.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken under the repealed regulations shall be deemed to have been done or taken under these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's Sixth Amendment to the 2010 Sharing of inter-State Transmission Charges and Losses Regulations. It was notified on 27 March 2019 but is given effect from 13.2.2018 (p1), so it operates retrospectively.

The operative part is short and does two things. First, it corrects two dates in Regulation 7(1)(y) and (z) of the Principal Regulations, replacing one date with another (p1). Second, it inserts a new sub-clause (aa) into Regulation 7(1) that exempts solar and wind generation from all inter-state transmission charges and losses for 25 years from the date of commercial operation of the project (p1–2). The exemption is conditional: the capacity must have been awarded through a competitive bidding process under Central Government guidelines, must have been declared under commercial operation within a defined window, and must have PPAs executed for sale of the power to all entities including distribution companies for meeting their renewable purchase obligations (p1–2).

A closing Note records the Gazette citations of the Principal Regulations and of the five earlier amendments to them (p2). No other provisions of the 2010 Regulations are touched.

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff

Read with this

Other copies of these documents (7)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document