Sharing of Inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2017

Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) (Fifth Amendment) Regulations, 2017

Amendment · Gazette copyDated 14 Dec 2017No. L-1/44/2010-CERC dated 14th December, 2017

Replaced by Sharing of Inter-State Transmission Charges and Losses Regulations, 2020

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Sharing of Inter-State Transmission Charges and Losses (Fifth Amendment) Regulations, 2017.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken under the repealed regulations shall be deemed to have been done or taken under these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Fifth Amendment to the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2010, issued in New Delhi on 14 December 2017 under section 178 read with Part V of the Electricity Act, 2003 (p4). The document is bilingual: a Hindi version occupies pp2–3 and the English text runs pp4–6. It takes effect from Gazette publication, except two provisions expressly made retrospective (p4).

Regulation 2 inserts new sub-clauses (y) and (z) into Regulation 7(1), exempting solar and wind generation from ISTS transmission charges and losses for 25 years from commercial operation, subject to three conditions — competitive bidding, a defined commercial-operation window and PPAs with distribution companies for RPO compliance (p4). These eligibility conditions are the operative point of the amendment; the solar window is 1.7.2017–31.12.2019 and the wind window 30.9.2016–31.3.2019, with corresponding backdated effect.

Regulation 3 substitutes the fourth proviso to Regulation 8(5) on charges for start-up power and infirm power and their reimbursement to DICs, and adds Regulation 8(7) requiring billing at the Average PoC rate of the target region where a POC rate is undetermined for the quarter (p5). Regulation 4 substitutes the second proviso to Regulation 11(5) on adjustment of Medium Term Open Access quantum against a DIC's Long Term Access (p5). Regulation 5 replaces Regulation 11(6) on the third part of the bill — FERV, incentive, rescheduling of transmission asset commissioning and arrears — and fixes its billing cycle (p5). Regulation 6 replaces the provisos to Regulation 11(9) with a new Clause (10) setting how STOA charges offset against LTA charges for DICs, including collective transactions, with stated exclusions (p5–6).

A closing Note lists the Principal Regulations and the four earlier amendments with Gazette citations and dates (p6).

Standard name
Sharing of Inter-State Transmission Charges and Losses
Primary topics
Transmission tariff, Open access

Read with this

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document