Skip to content

CERC · Central Electricity Regulatory Commission

Renewable Energy Certificate for Renewable Energy Generation (Third Amendment) Regulations, 2014 — Draft

Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (Third Amendment) Regulations, 2014

Draft amendmentDated 30 Sep 2014No.L‐ 1/12/2010‐ CERC dated 30th September, 2014

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a CERC draft notification dated 30 September 2014 carrying the Third Amendment to the 2010 Renewable Energy Certificate Regulations (p1). Clause 1 names the amending regulations and ties commencement to publication in the Official Gazette, a date the text does not print (p1).

Clause 2 amends Regulation 5 so that a distribution licensee may register with the Central Agency to be issued and deal in certificates, on conditions that it procured renewable energy in the previous financial year above its renewable purchase obligation at section 62 tariffs or adopted section 63 tariffs, that the specified obligation for a year cannot fall below the previous year's, and that the Appropriate Commission certifies the procurement; wording is also changed in Regulation 5(2) to bring licensees alongside generating companies (p1–2).

Clause 3 reworks Regulation 7: the existing eligibility wording is confined to entities other than distribution licensees, licensees get three months from certification to apply to the Central Agency, and issuance ratios are set out — a full certificate per MWh where electricity is sold to the local distribution licensee at pooled cost or on a power exchange, a half certificate where it is sold to another licensee or an open access consumer at a mutually agreed price, and a half certificate for renewable captive self-consumption (p2–3). The quantum for solar generating companies is deferred to a separate Commission order using a vintage multiplier formula, whose terms — APPC, minimum requirement and base year — are defined in the text, with the multiplier running twelve years from commissioning (p3).

Clause 4 adds a proviso to Regulation 10 extending by 365 days the validity of certificates expiring within a year of notification (p4). A closing note records the gazette publication of the principal regulations and the first two amendments (p4).

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC), Renewable purchase obligation (RPO / RCO)

Read with this

The regulation

Other copies of these documents (4)

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document